My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 7/25/2016
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/25/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 1:45:18 PM
Creation date
7/27/2016 9:27:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/25/2016
Council Approval Date
7/6/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall PSO 6 Reroute
Public Works WO Number
UP 3583
Tracking Number
0000178
Total Compensation
$820,344.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 3/1/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS DOCUMENT 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> 5.1 Notice to Proceed 21 <br /> 5.2 Contract Time 22 <br /> 5.3 Suspension Procedures 25 <br /> 5.4 Termination Procedures 25 <br /> 5.5 Possession and Use of Completed Portions of the Work 27 <br /> 5.6 Possession of Incomplete Portions of the Project 28 <br /> 5.7 Substantial Completion 28 1 <br /> 5.8 Acceptance of Work 29 <br /> ARTICLE 6 CHANGES 29 <br /> 6.1 Owner's Right to Direct Changes to the Work 29 <br /> 6.2 Extra Work 29 <br /> 6.3 Change Orders 30 1 <br /> 6.4 Value Engineering and Cost Sharing 30 <br /> ARTICLE 7 LABOR STANDARDS 31 <br /> 7.1 Wages of Employees 31 I <br /> 7.2 Payment Certificates 32 <br /> 7.3 Hours of Labor 32 1 <br /> 7.4 Contract Work Hours- 32 <br /> 7.5 Overtime Work 32 <br /> 7.6 Labor Relations 32II <br /> ARTICLE 8 MATERIAL,EQUIPMENT,WORKMANSHIP AND CONSTRUCTION UTILITIES33 <br /> 8.1 General 33 1 <br /> 8.2 Product Data 34 <br /> 8.3 Quality 34 <br /> 8.4 Material and Equipment Specified by Name 34 <br /> 8.5 Requests for Substitution 34 <br /> 8.6 Demonstration of Compliance with Contract Requirements 35 <br /> 8.7 Defective Work 36 <br /> 8.8 Materials and Equipment Furnished by Owner 37 <br /> 8.9 Guarantee 38 <br /> 8.10 Correction Period 38 <br /> ARTICLE 9 MEASUREMENT AND PAYMENT 39 <br /> 9.1 Payments to Contractor 39 <br /> 9.2 Payment for Changes 42 <br /> 9.3 Charges to Contractor 44 <br /> 9.4 Compensation to Owner for Time Extension 45 <br /> 9.5 Adjustment of Contract Sum 45 <br /> 9.6 Unabsorbed and Extended Overhead 46 1 <br /> 9.7 Force Account 46 <br /> PSO6 REROUTE 007213 -2 I <br /> WO NO.-UP3583 MAY 2016 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.