My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 7/25/2016
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/25/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 1:45:18 PM
Creation date
7/27/2016 9:27:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/25/2016
Council Approval Date
7/6/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall PSO 6 Reroute
Public Works WO Number
UP 3583
Tracking Number
0000178
Total Compensation
$820,344.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 3/1/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS DOCUMENT 00 11 13 <br /> SPECIAL PROVISIONS ADVERTISEMENT FOR BIDS <br /> CITY OF EVERETT, WASHINGTON <br /> SPECIFICATIONS FOR <br /> PUGET SOUND OUTFALL NO. 6 REROUTE <br /> WO No. - UP3583 <br /> NOTICE TO CONTRACTORS <br /> ADVERTISEMENT FOR BIDS <br /> Notice is hereby given that sealed bids for the Puget Sound Outfall No. 6 (PSO6) Reroute will be received <br /> at the office of the City Clerk, 1St Floor Wall Street Building, 2930 Wetmore, Everett, Washington 98201, <br /> until 2:00 p.m. on Tuesday, June 14, 2016. At the appointed time, all bids will be opened and publicly <br /> read aloud in the 8th floor hearing room at the Wall Street Building. The engineer's estimate for this Pro- <br /> ject is $583,160. <br /> Work being performed includes, but is not limited to, furnishing all labor, materials and equipment neces- <br /> sary for construction of a new combined sewer outfall pipe consisting of approximately 182 LF of polypro- <br /> pylene pipe and two manholes, including one pile supported manhole, demolition and replacement of <br /> bulkhead wall tie backs, where existing tie backs conflict with installation of the new pipe and other such <br /> appurtenances and performing all Work as required by the Contract, in accordance with the Contract <br /> Documents. The project is located within the Port of Everett Property. <br /> Plans, Specifications, Addenda, and plan holders list for this Project may be viewed on line at <br /> https://everettwa.gov/319/Bid-Opportunities. <br /> Plan sets may also be purchased at Bill's Blueprints (425) 259-0859 at 2920 Rockefeller Avenue, Everett, <br /> WA 98201. <br /> For technical questions regarding this Project contact: Arnie Roshak P.E., Project Manager, City of Ever- <br /> ett, at(425)257-7249. <br /> All bids must be made upon the regular forms provided for this purpose and must be accompanied by a <br /> bid bond or certified check in an amount not less than five percent(5%)of the total amount of the Bid. <br /> The City reserves the right to reject any and all bids and to waive any irregularities or informalities. No <br /> Bidder may withdraw his Bid after the hour set for the opening thereof. The City further reserves the right <br /> to make the bid award as deemed in the best interest of the City. The right is reserved by the City to <br /> postpone the award for a period of forty-five (45)days after bid opening. <br /> The Contractor will be required to comply with all local, State, and Federal laws and regulations pertaining <br /> to equal employment opportunities. <br /> By order of the City Council, Everett,Washington. <br /> Dated at Everett, Washington. <br /> 1 <br /> SHARON FULLER, CITY CLERK <br /> I <br /> PSO6 REROUTE 001113 -4 <br /> WO NO.—UP3583 MAY 2016 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.