Laserfiche WebLink
,..,,a INSPECTION REPORT <br /> Date: ( ,2Y l 3 Permit: L(Ud 2- o z <br /> Ati 4- <br /> Contractor: 6 oot, �F�uS4' <br /> tf.- Owner: I .40t rtol=' <br /> Site Address: G 3 7., `3 (,t\ 6EE-cry <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> LI Groundwork ❑Footing ❑ Rough In ❑Rough In <br /> P able.:-. •• ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> Rorjilkwn ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> • rounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing LI Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid Li Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> O .- -`. . TATION: <br /> APPROVAL [] PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ Or •- T.C.O. ❑ CORRECTION REQUESTED <br /> r] OK <br /> OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Ofd- V--66tN& grci=e_riz..tcAte-i <br /> /4,--5 TE--a__ / K#r14 <br /> /. <br /> 4Jo TE= © ) c7 mac p t2ir rff ei..6 s <br /> ig• Ff L , g671012,22044 G't Ku i c T1-5- <br /> Inspector: Date: ( a�((3 <br /> EIR(4/09) XIGN/1.7uR FORM,& MOI IONS• 42c/4H0-8900 <br />