Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard#601. <br /> 5. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 6. Connect all rooftop downspouts to the side sewer. <br /> 0 Connect rooftop downspouts to the drainage system provided for this lot. <br /> 8. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size trench is 3.5'wide, 2'deep and 25' long. See attachment for <br /> more details. <br /> 9. The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br /> beginning the project.010. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br /> bales, swales, or erosion blankets. <br /> 11. Install erosion control measures per City of Everett Standards for small parcels <br /> goRemove erosion control measures upon completion of the project prior to final approval of the permit. <br /> 13. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br /> permitted site. No wasting of material is allowed on this building lot. <br /> 14. No dirt, mud, rocks or debris to be tracked onto roadway. <br /> 15. No building materials to be stacked on sidewalks and sidewalks to be kept clean and open for <br /> pedestrian travel. <br /> 16. Adjust water meter box 1"above sidewalk grade. <br /> 17. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan#'s 305A& 306 on <br /> this proposal's frontage as directed by the Public Works Inspector(i.e. all unused driveways and any <br /> broken or damaged area must be replaced). <br /> 18. Install a Type I concrete driveway per City of Everett Standard#307. <br /> 19. Pave driveway from the front property line out to the street paving. <br /> 20. Contact the Water District for connecting provisions for this building's water and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan#402 with a gas trap per Standard Plan#410 is required for the <br /> parking area. <br /> 22. If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, then <br /> gravity flow across the public right-of-way. <br /> 23. A sprinkler system is required for this building in compliance with the requirements of NFDA Standards <br /> 13D. <br /> PWComments <br />