Laserfiche WebLink
f 1 <br /> 40;t ;:y INSPECTION REPORT <br /> . ' ' Date: 11 I 0\ Permit: 1 (002- 5 <br /> i , <br /> Contractor: hh� <br /> Owner: /J V <br /> Site Address: <br /> 0\1\_,, <br /> E I e% {/ W\ "oL <br /> (r1 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final I]Shear Nailing GAS PIPE <br /> SITE WORK LI Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid I]Refrigeration ❑.Rough In <br /> LI Roof drains ❑Building Final LI Gas Pipe Final HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. n CORRECTION REQUESTED <br /> 7121–' <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> 1 — til. ,/7— h eivg e <br /> ,....._ ,62 6)7-- 6.-•)/<, 1,-- <br /> if ....... LA.. <br /> Inspector: Date: / <br /> EIR(4/09) ,K;�wNa/URE I a PROM*mONs• 425/. 18-891/1) <br />