My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Amend 1 Murray Smith & Assoc
>
Contracts
>
6 Years Then Destroy
>
2018
>
Professional Services Amend 1 Murray Smith & Assoc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2016 9:08:25 AM
Creation date
8/1/2016 9:08:17 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murray Smith & Associates MSA
Approval Date
7/25/2016
Council Approval Date
7/25/2016
End Date
12/31/2018
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Legion Golf Course Stormwater Dentention
Public Works WO Number
UP 3620
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Deliverable: <br /> 1. Miscellaneous reference plans and technical support for City of Everett <br /> permits and SEPA checklist. <br /> 2. Recommendations for acquiring easements. <br /> Task 12 - Bidding Assistance <br /> This task provides assistance to the City during bidding and award of the project. Elements <br /> of this task will include: <br /> 12.1 Bidder Inquiries and Addenda—Assist the City in responding to bidder's questions. <br /> Prepare draft and final addenda, if necessary,to clarify or correct bid documents. <br /> 12.2 Bid Review—Provide supplemental support in reviewing bids, checking references <br /> and selecting the apparent low bidder. <br /> 12.3 Conformed Drawings and Specifications—Prepare conformed drawings and <br /> specifications as required for construction. <br /> Assumptions: <br /> 1. The City will take the lead in tasks associated with printing bid documents, <br /> document distribution, bid advertisement, addenda distribution, plan holder <br /> administration, bid evaluation, bid tabulation etc. <br /> 2. The City will take the lead in receiving and answering bidders' questions. <br /> 3. The City will provide two sets of contract documents to MSA for use during <br /> the bidding period. <br /> Deliverables: <br /> 1. Draft addenda as required for the City to distribute to plan holders. <br /> 2. Conformed drawings and specifications if required. <br /> Task 13—Construction Management Support <br /> This task represents involvement of MSA during the construction of the improvements to <br /> support the City's on-site inspector and construction management group. MSA's <br /> involvement during construction will be limited to support and periodic collaboration with <br /> the City, the construction contractor,permitting agencies and others, all at the direction of <br /> the City up to the extent of the budget for this task. Anticipated elements of this task will <br /> include: <br /> 13.1 Meetings—Attend a pre-construction conference with City and construction <br /> contractor and invited agencies and utilities. MSA will be available to answer <br /> questions. Attend project progress meetings with City and contractor, as necessary. <br /> City of Everett MURRAY,SMITH&ASSOCIATES,INC.Legion Golf Course SW Detention <br /> June 2016 Engineers/Planners Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.