UP 3598 Change Order 1
>
Contracts
>
Capital Contract
>
UP 3598 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2016 10:22:08 AM
Creation date
8/1/2016 10:22:06 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates
Approval Date
7/11/2016
Department
Public Works
Department Project Manager
Mike Kangas
Subject / Project Title
Water Main Replacement P Change Order 1
Public Works WO Number
UP 3598
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Total Compensation
$23,400.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Water Main Replacement"P" <br /> Change Order No.: 1 <br /> Change Order Effective Date: 06-24-2016 <br /> 1. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work. In <br /> calculating such threshold amounts, Washington State sales tax, if applicable to the <br /> Work, has been considered. <br /> 2. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 3. Contractor waives and releases any and all claims arising out of, or related to, this <br /> Change Order, the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including, but <br /> not limited to, claims for equitable adjustment of time and compensation, delay, impact, <br /> overhead, or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest, dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition, protest, dispute, claim, or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order, then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 4. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> ,?a 1 d <br /> urn(/ -ALAt ' ht 7x zekD k ,46fiw 4�"%0 b0p# 1� �d <br /> ":# <br /> _, •. ,��,�'Ssu a."�.,� a,F.�i,'�'7+k.:k ,�9„44��hm,�-���5�„.� ;. <br /> Attest: Approved As to Form: <br /> 1 <br /> Ich4604A444-- <br /> Ma r City Clerk City Attorne <br /> Date: //I/filo Date: :/I/l6/4 '� <br /> e: 9-- 61/62 <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> Date: 6 - Date: Date: Date: <br /> 7/ <br /> Page 2 of 4 <br />