Laserfiche WebLink
Project: Water Main Replacement "P" <br /> Change Order No.: 1 <br /> Change Order Effective Date: 06-24-2016 <br /> Bid Item 72-Vehicle Detection Loops. The bid item for Vehicle Detection Loops over ran the <br /> estimated amount in the contract and, as a result additional funds are needed to complete the project. <br /> Exhibit C—Additional Contract Time: <br /> The added work associated with Bid Items 25 and 26 resulted in one (1) additional working day. The <br /> removal of work associated with Bid Item 71 resulted in a reduction of two (2) working days. The <br /> added work associated with Bid Item 72 resulted in one (1) additional work days. Comprehensively, <br /> there are no additional working days added for this change order. <br /> Exhibit D—Summary of Changed Values <br /> Water Main Replacement P <br /> UP 3598 <br /> Change Order One Modified Bid Item Summary <br /> Added Unit Added <br /> Item Description Units Price Value <br /> HAM Trench Patch 30 160.00 4,800.00 <br /> HMA Overlay 20 200.00 4,000.00 <br /> Gravel Borrow 300 22.00 ; 6,600.00 <br /> Pavement Markings (1.00) 10,000.00 i (10,000.00) <br /> Detection Loops i 600 30.00 18,000.00 <br /> TOTAL ADDED VALUE 23,400.00 <br /> Page 4 of 4 <br />