My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Materials Testing 7/11/2016
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Materials Testing 7/11/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2016 11:16:47 AM
Creation date
8/1/2016 11:16:37 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Materials Testing
Approval Date
7/11/2016
Department
Public Works
Department Project Manager
Keith Alewine
Subject / Project Title
Hawthorne Elementary Safe Routes
Public Works WO Number
PW 3540
Tracking Number
0000199
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br /> Materials Testing & Consulting, Inc. v. ! <br /> ik, co <br /> Geotechnical Engineering&Consulting•Materials Testing•Special Inspection•Environmental Consulting , _• <br /> Date:March 31,2016 ~ `""'"°"��P <br /> Client Name: City of Everett Contact: Elreee-Ye eee <br /> Address: 3200 Cedar Street#5,Everett,WA 98201 Keith Alewine <br /> Phone: (.*2i) 7■0056• (425)257-7225 Fax: <br /> Email:iikome@sliessitwaywo Kalewine@everettwa.gov <br /> Project Name/Location: Hawthorne Elem-City of Everett/11th&Poplar Street,Everett,WA <br /> Materials Testing&Consulting,Inc.(MTC)thanks you for the opportunity,and respectfully submits the following proposal to provide materials testing <br /> and special inspection services during construction of the above-referenced project. <br /> Based on Civil/Structural drawings dated:3-15-16 Architect:City of Everett Public Works <br /> Combined with our past experience with projects of similar size and scope,we estimate the total cost of our services for this project to be: <br /> (01)Earthwork&Asphalt Services <br /> Item Unit Quantity Rate Total <br /> IPD-S-Site Subgrade&Rock Course Compaction(104/tons) Hour 6 $ 55.00 $ 330.00 <br /> IPD-A-Asphalt Paving(137/tons) Hour 6 $ 55.00 $ 330.00 <br /> Sample Pickup if Required(Allowance) Hour 4 $ 55.00 $ 220.00 <br /> Subtotal-Earthwork&As,halt Services: $ 880.00 <br /> (02) Laboratory Testing for Earthwork&Asphalt/Advanced Geotechnical Laboratory Tests <br /> Item Unit Quantity Rate Total <br /> Moisture Density Relationship/Proctor with Sieve Each 1 $ 235.00 $ 235.00 <br /> Sand Equivalent Each 2 $ 80.00 $ 160.00 <br /> Fracture Percentage Each 1 $ 60.00 $ 60.00 <br /> Asphalt Extraction with Gradation Each 1 $ 235.00 $ 235.00 <br /> Rice Density Each 1 $ 80.00 $ 80.00 <br /> Subtotal-Laborato for Earthwork&As.halt: $ 770.00 <br /> (30) Project Management&Consulting Services <br /> Item Unit Quantity Rate Total <br /> Project Manager Hour 1 $ 80.00 $ 80.00 <br /> Subtotal-Project Management&Consulting Services:, $ 80.00 <br /> Budget Estimate for Services-Total: $ 1,730.00 <br /> • Prices are subject to change if this agreement is not executed within 90 days from the date of the bid. <br /> • All services will be provided on a time and materials basis. The total is an estimate the actual construction cost will be based on the project <br /> schedule and sequencing.The estimate is not a guaranteed price.A four hour minimum charge applies to all work performed,billing is also based on a <br /> portal to portal basis. <br /> • MTC will utilize the laboratory based closest to the project site.MTC offers additional services upon request which will be billed at our regular fee <br /> schedule.Acceptance of this proposal will constitute agreement to MTC standard general terms and conditions. <br /> • In closing,our experienced inspection staff will ensure the highest level of quality is brought to your project. We believe that our local staff and <br /> vast experience on projects of similar size and scope make MTC the clear team member of choice for this project. We look forward to working with you. <br /> Respectfully Submitt , <br /> Client Authorized Signature <br /> Barry 7Bro .o.,Est' ator <br /> (360)755-1990 Printed Name&Title Date <br /> Corporate•777 Chrysler Drive•Burlington,WA 98233•Phone 360.755.1990•Fax 360.755.1980 <br /> SW Region•2118 Black Lake Blvd.S.W.•Olympia,WA 98512•Phone 360.534.9777•Fax 360.534.9779 <br /> NW Region•805 Dupont St,Suite 5•Bellingham,WA 98226•Phone 360.647.6061 •Fax 360.647.8111 <br /> Kitsap Region•5451 N.W.Newberry Hill Road,Suite 101 •Silverdale,WA 98383•Phone/Fax 360.698.6787 <br /> Vi;ii()Ill wcbsiicrvNw.mlr-inc ncl <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.