My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Materials Testing & Consulting Inc. 7/11/2016
>
Contracts
>
6 Years Then Destroy
>
2017
>
Materials Testing & Consulting Inc. 7/11/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2016 11:28:36 AM
Creation date
8/1/2016 11:28:27 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Materials Testing & Consulting Inc.
Approval Date
7/11/2016
End Date
6/30/2017
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Sewer System "M" Repl Phase II
Public Works WO Number
UP 3470
Tracking Number
0000200
Total Compensation
$25,594.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ex 14/13 /7- �& <br /> Materials Testing & Consulting, Inc. <br /> tNalltkili <br /> Geotechnical Engineering&Consulting•Materials Testing•Special Inspection•Environmental Consulting <br /> 7- Aittzum4;000c <br /> Date:April 15,2016Contact: Keith Alewine <br /> Client Name: City of Everett Purchasing Division <br /> Address: 3200 Cedar Street,Everett,WA 98201 Fax:Phone: (425)257-7225 Office(425)754-6513 Cell <br /> Email: Kalewine@everettwa.gov <br /> Project Name/Location: Sewer M Phase 11/Various Streets,Everett,WA <br /> Materials Testing&Consulting,Inc.(MTC)thanks you for the opportunity,and respectfully submits the following proposal to provide materials testing <br /> and special inspection services during construction of the above-referenced project. Architect:City of Everett!Jacobs <br /> Based on Civil/Structural drawings dated:4-13-16 <br /> Combined with our past experience with projects of similar size and scope,we estimate the total cost of our services for this project to be: <br /> (01) Earthworl.& Asphalt Services Unit Quantity Rate Total <br /> hour 140 $ 49.00 $ 6,860.00 <br /> IPD-S-Utility Trench Compaction(7823/tons) Hour 14 $ 49.00 $ 860.00 <br /> IPD-S-Foundation Material(1280/tons) _ Hour 84 $ 49.00 $ 3,686.00 <br /> IPD-S-Gravel Borrow(8700/tons) Hour 26 $ 49.00 $ 1,274.00 <br /> IPD-S-Site Subgrade&CSTC CSBC Compaction(3840/tons) Hour 4 $ 49.00 $ 174.00 <br /> 1PD-A-Asphalt Treated Base(70/tons) Hour 4 $ 49.00 $ 196.00 <br /> 1PD-A-Asphalt Pavin:Tem.Patch(200/tons) Hour 8 $ 49.00 $ 396.00 <br /> IPD-A-As p halt Pavin: 730/tons) Hour 8 $ 49.00 $ 392.00 <br /> SAMPU Sam.1e Picku. if Rep uiretl(Allowance <br /> Subtotal-Earthwork&As halt Services: $ 13,916.00 <br /> (02) Laboratory Testing for Earthwork& Asphalt/ Advanced Geotechnical bo atonyQuTestsUniRate Total <br /> Each 5 $ 225.00 $ 1,125.00 <br /> Moisture Densit Relationshi./Proctor with Sieve Each 5 $ 95.00 $ 125.00 <br /> Sieve Anal sis with#200 Wash/Combined Gradation _ Each 17 $ 80.00 $ 1,360.00 <br /> Sand E•uivalent Each 13 $ 50.00 $ 650.00 <br /> Each 3 $ 225.00 $ 675.00 <br /> Asphalt Extraction with Gradation Each 3 $ 75.00 $ 225.00 <br /> Rice Densi4,985.00 <br /> Subtotal-Laboratory for Earthwork&As•halt: $ <br /> (03) Special& Construction Inspection Unit Quanti Rate Total <br /> Item hour 24 $ 49.00 $ 1,176.00 <br /> RC-Concerct Pavement Panels(280/cuyd) Hour 32 $ 49.00 $ 1,576.00 <br /> RC-Concrete Pavement(370/cuyd) Hour 16 $ 49.00 $ 784.00 <br /> RC-Concrete Curbs,Drivewa s,Sidewalks,Ram.s 56/cu d) <br /> Subtotal-S•ecial&Construction Inspection: $ 3,528.00 <br /> (04) Laboratory Testing-Special&Construction Inspection Unit Quanti Rate Total <br /> 00 <br /> Concrete Com ression Test C lindens-4"x 8" Each 80 $ 18.00 $ 1,440. <br /> Sets of 5 Subtotal-S i ecial&Construction Ins.ection: S 1,440.00 <br /> (30) Project Management&Consulting Services Unit Quanti Rate Total <br /> Item _ Hour 23 $ 75.00 $ 1,725.00 <br /> Pro ect Manager <br /> Subtotal-Pro'ect Mana:ement&Consultin:Services: $ 1,725.00 <br /> Budget Estimate for Services-Total: $ 25,594.00 <br /> • Prices are subject to change if this agreement is not executed within 90 days from the date of the bid. <br /> • All services will be provided on a time and materials basis. The total is an estimate the actual construction cost will be based on the project <br /> schedule and sequencing.The estimate is not a guaranteed price.A two hour minimum charge applies to all work performed,billing is also based on a <br /> portal to portal basis. <br /> • MTC will utilize the laboratory based closest to the project site.MTC offers additional services upon request which will be billed at our regular fee <br /> schedule.Acceptance of this proposal will constitute agreement to MTC standard general terms and conditions. <br /> • In closing,our experienced inspection staff will ensure the highest level of quality is brought to your project. We believe that our local staff and <br /> vast experience on projects of similar size and scope make MTC the clear team member of choice for this project. We look forward to working with you. <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.