Laserfiche WebLink
INSPECTION REPORT <br /> Date: I Permit: .� <br /> x <br /> Contractor: "U � <br /> Owner:-619 146 <br /> U 1, <br /> Site Address: A'�wi:::�Q 10 In ®I <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation, ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Gro ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> Grog', <br /> ❑Drywall Nailing ❑Plumbing Final <br /> ff-1 <br /> lectrical in I ❑Shear Nailing GAS PIPE <br /> E WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> oo mg drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P IT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> /V <br /> Inspect r: 7UDate: <br /> EIR(4/09) )CS�SF���� ORMS&PROMOTIONS a 425/968.6900 <br />