Laserfiche WebLink
CorrosionStructural Mechanical , Electrical � Civil <br /> AFORMAN <br /> . <br /> February 19,2016 <br /> The Boeing Company <br /> Attn: Damir Alic <br /> Everett,WA <br /> Project: Boeing Building 45-012 <br /> New Manufacturing Building <br /> Everett,WA <br /> To Whom it May Concern: , <br /> To the best of my information,knowledge, and belief,based on site observation visits conducted <br /> by myself or an employee of my firm,and the review of special inspection/test reports,the <br /> Primary Structural Frame of the building is complete and the work has been performed in a <br /> manner consistent with the construction documents and in accordance with applicable building <br /> codes. <br /> gY e 0- <br /> Sincerely, <br /> - <br /> Sincerely, .� <br /> 33631 <br /> ATAL. � 2-19-16 <br /> Emery Ojala, S.E. <br /> Principal <br /> Structural Engineering <br /> eso:eso <br /> P.ISea114Jobs1141001 Boeing EDC Static Test Faclty EvrttU.0 CORRESPONDENCEIStructural Completion Letter.doc <br /> SEATTLE ANCHORAGE BAYAREA GUAM HONOLULU LOSANGELES SPOKANE <br /> 1601 FM Ave.,Suite 900 907.276.6664 5 10.2S 1.9578 671.300.7531 808.687.8884 818.285.2650 509.328.2994 yP` <br /> Seatde,WA 98101-1620 2� <br /> 206.623.0717 LASTING creativity I results I relationships (� <br />