My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 45-112 2018-09-20
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 45-112
>
3003 W CASINO RD BLDG 45-112 2018-09-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2018 2:12:37 PM
Creation date
8/2/2016 10:31:37 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 45-112
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> w , v <br /> as <br /> 1L <br /> Boeing 777X Static Test Facility 19106-01 <br /> February 29, 2016 Page 2 <br /> 3. Drilled Shaft Installation. We observed the installation of the six drilled shafts on a full-time basis <br /> between September 15 and 21,2015. The shafts were installed to the proper depth and generally <br /> within the anticipated soil conditions based on comparison of soil cuttings from the pier <br /> installation and review of nearby soil exploration logs. <br /> We have completed our work at the site. To the best of our knowledge,the construction related to the <br /> above-referenced items generally conformed to the recommendations contained in our geotechnical <br /> report,our input during construction,and the project plans. Our knowledge is based on the information <br /> contained in our daily field reports as well as correspondence during construction. <br /> We trust this letter meets your needs. Please call if there are any questions or concerns. <br /> Sincerely, <br /> HART CROWSER,INC. <br /> AV�l <br /> 3a350 <br /> NAL <br /> DOUGLAS D. LINDQUIST,PE, LEED AP <br /> Principal Geotechnical Engineer <br /> cc: Mary O'Hara,Coffman Engineers <br /> L:\Notebooks\1910601_777x Static Testing Build ing\Delivera bles\Lette r-Final Inspection 02-29-16\Boeing 777X-Final_Letter.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.