My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 45-114 2016-08-02
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 45-114
>
3003 W CASINO RD BLDG 45-114 2016-08-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2018 1:12:35 PM
Creation date
8/2/2016 10:55:38 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 45-114
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HAI s <br /> February 29, 2016 <br /> Emery Ojala <br /> Coffman Engineers <br /> 1601 Fifth Avenue,Suite 900 <br /> Seattle,Washington 98101-1620 <br /> Re: Final Letter for Geotechnical Construction Observations <br /> Boeing 777X Static Test Facility <br /> Everett,Washington <br /> 19106-01 <br /> Dear Mr. Ojala: <br /> Hart Crowser has completed our geotechnical construction observations for the Boeing 777X Static Load <br /> test Facility project at Paine Field in Everett,Washington. The purpose of this letter is to summarize <br /> construction observations performed by Hart Crowser at the site. Hart Crowser was responsible for the <br /> following items: <br /> 1. Observe and Monitor Excavation, <br /> 2. Micropile Installation, and <br /> 3. Drilled Shaft Installation. <br /> We have provided full-time or part-time observations(depending on the level of construction activity) <br /> between June 11, 2015,and September 21, 2015,to observe the activities identified above. A summary <br /> of our inspection activities is provided in the following sections. Detailed information was documented <br /> in our daily field reports that were transmitted to the Coffman and other project team members during <br /> construction. We completed 52 field reports documenting our observations on this project. <br /> 1. Observe and Monitor Excavation and Subgrade Condition. Hart Crowser was on site on a part- <br /> time to full-time basis to observe this work and to observe overexcavation and subgrade <br /> conditions. Observations are summarized in our field reports for the site. <br /> 2. Micropile Installation. We observed the installation of the micropile piles for this project on a full- <br /> time basis. We also observed two full-scale load tests on test piles and production testing. The <br /> pile load test results and updated recommendations were documented in a Hart Crowser <br /> memorandum dated June 24, 2015. The production piles were installed to the proper depth <br /> within the bearing soil unit generally as anticipated based on comparison with the load-tested <br /> piles and consideration of the soil conditions documented in nearby exploration logs. <br /> 3131 Elliott Avenue.Suite 600 <br /> Seattle,Washington 98121 <br /> Fax 206.328.5581 <br /> Tel 206.324.9530 <br />
The URL can be used to link to this page
Your browser does not support the video tag.