Laserfiche WebLink
INSPECTION REPORT <br /> Date: qAl�- Permit: <br /> ,Sp� <br /> Contractor: <br /> Owner: <br /> Site Address: til �t( <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL i BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑ Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service []Framing ❑ Rooftop Units ❑Water Service <br /> ❑Groundi ❑Insulation []Mechanical Final �_]Medical Gas <br /> ei ing ❑Drywall Nailing ❑ Plumbing Final <br /> KIEWctrical Fin ❑Shear Nailing GAS PIPE <br /> ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains [ ]Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains (]Building Final [ ]Gas Pipe <br /> �Final <br /> -���/" ❑HWTT/Fii/nal p� <br /> OTHER OR CONSULTATION: 5{i Z li(/1y -7 <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PE <br /> ❑ OK FOR T.C_O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION r- <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> zlof <br /> Inspector: Date: <br /> EIR(4/09) �r� <br /> - I1>RMti K PROMO 1IONS 42-,/48441900 <br />