My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2926 COLBY AVE 2016-08-02
>
Address Records
>
COLBY AVE
>
2926
>
2926 COLBY AVE 2016-08-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2016 4:06:11 PM
Creation date
8/2/2016 4:06:10 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2926
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sent <br /> We <br /> July 21, 2015 <br /> Marls <br /> Evergreen State Sheet Metal <br /> 2120 Pacific Ave <br /> Everett,WA 98201 <br /> Project; REPLACE RTU-JENSING,TRI, ATTYS <br /> Reference: M1507-037 <br /> Owner; CAROUSEL PARTNERS <br /> Job Address: 2926 COL,BY AVE <br /> RE: MECHANICAL CORRECTIONS UTTIE~R <br /> Dear Mark, <br /> In response to the application for a building permit, the plans have been examined and you are advised that <br /> revisions may be necessary before a permit can be Issued. Please review and respond to the comments <br /> below. Plan review will resume when the requested information is submitted. All required submittals must be <br /> of sufficient detail and Information to ensure that the proposed structures will be constructed in compliance <br /> with all adopted codes, with two sets of drawings submitted for revisions. <br /> General <br /> 1. The permit application indicates that unit(s)will be replaced. Please clarify the weight and location the <br /> new unit and the unit to be replaced, on building plans and an equipment schedule. <br /> r <br /> Structural <br /> 1. Please provide stamped structural verification by a Washington State licensed professional engineer <br /> that the new equipment can be supported by the existing building structure. This should Include <br /> detailing Iof structural revisions where required tosuprthe new equipment. <br /> Mechanical <br /> 1. Please submit manufacturer's documentation indicating that the new mechanical units comply with the <br /> economizer requirement of.WSEC C101.4.3.2, C403, and C403,3,1, or C403.4.1. <br /> fli��4k'rt� :i 1 i ', r .. ',r.:;'r ( : � /I. jrsr: , �•;f,+. <br /> Applicable codes include the 2012 International Building Code, the 2012 International Fire Code,the 2012 <br /> International Mechanical Code, and the 2012 Washington State Energy Code(WSEC). All codes referenced, as <br /> adopted by the City of Everett, should include current revisions by the State of Washington. Revisions or <br /> additions may be required by other departments(such as Utilities, Planning, or Fire). Please contact me if <br /> you would like to discuss this letter by e-mail at mhaley@everettwa.gov or by phone at 425-257-8813. <br /> 5incerely, <br /> eg Ha ey, RA <br /> an Revie Architect <br /> f <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.