My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4704 DARLINGTON LN 2016-08-03
>
Address Records
>
DARLINGTON LN
>
4704
>
4704 DARLINGTON LN 2016-08-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2016 9:59:04 AM
Creation date
8/3/2016 9:59:02 AM
Metadata
Fields
Template:
Address Document
Street Name
DARLINGTON LN
Street Number
4704
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• I <br /> H • <br /> LPVmodules <br /> ports for solar modules are Installed to spread the dead load across as many roof- <br /> ing members as needed to ensure that no point load exceeds fifty(50)pounds, O <br /> M2302.2,1(5)) <br /> photovoltaic modules and supporting structure shall be constructed bf <br /> combustible materials or fire-retardant treated wopd equivalent to that required for Q <br /> oof construction. [IRC M2302,2.11 <br /> artd.wall penetrations sha!(be flashed and sealed to prevent entryof water, (7 <br /> nts,and Insects.[IRC M2302.2.21 <br /> odules are listed and labeled with a fire classlflcgtlon in accordance with UL 1703. 13 <br /> M2302.2.3J ` 's: <br /> E 1f you answered yes to ali of•the above�quest`ions,the"project cjuallfies for the over-the- <br /> counter permitting process. <br /> Determine if your project qualifies for an Over-the-Counter electrical permit <br /> Yes No N/A <br /> 1. PV modules,Inverters,and combiner boxes are Identified for use in PV systems. Q <br /> 2. The Inverters are listed and labeled In accordance with UL.1741 and are listed for T E <br /> utility ifiteractipn.(IRC M2302.41 <br /> 3. The AC.tnterconnectlon point Is on the load side of service disconnect.[NEC 690,64(B)) <br /> 4. The system meets all current NEC,City and Washington Cities Electrical Code <br /> requirements. <br /> 5. For Split-Buss modules the AC interconnection must be one of the six service 0 El <br /> disconnects, <br /> 6. Maximum load added to the panelboard Is based on the rating of the panelboards bus/main OCPD <br /> combination in accordance with NEC 705.12(1))(2)(3)(b),and Is limited to(check combination that <br /> applies): <br /> 11225 amp bus/200 amp main OCPD-13,440 AC watts,maximum 70 amp inverter OCPD. <br /> 11225 amp bus/225 amp main OCPD- 8,640 AC watts,maximum 45 amp inverter CCPD. <br /> x[200 amp bus/200 amp main OCPD- 7,860 AC watts,maximum 40 amp inverter OCPD. <br /> 11150 amp bus/150 amp main OCPD- 5,760 AC watts,maximum 30 amp inverter OCPD. <br /> ❑125 amp bus/125 amp main OCPD- 4,800 AC watts,maximum 25 amp inverter OCPD. <br /> 0125 amo bus/100 amp main OCPD- 9,600 AC watts,maximum 50 amp Inverter OCPD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.