August 12, 2015 G-3945 <br /> Geotechnical Evaluation&Underpinning Engineering Page 5 <br /> 5131 Dogwood Drive, Everett <br /> PIER INSTALLATION DESCRIPTION <br /> The push pier is advanced into the soil with a hydraulic pump and cylinder combination using the <br /> structure as the reaction force. The hydraulic pressure is monitored with a calibrated pressure <br /> gauge and the tube installation pressures recorded. When the tip of the pier reaches suitable <br /> bearing strata the hydraulic force on the pier is gradually increased to 200 percent of the design <br /> load or until movement of the design frame occurs (the foundation begins to lift). <br /> INSPECTION <br /> We recommend the final pier depths and the recorded pier installation pressures be reviewed by <br /> the geotechnical engineer to verify proper embedment to the bearing strata and to verify <br /> acceptable pier capacities are achieved. <br /> EVALUATION OF PIERS PREVIOUSLY INSTALLED <br /> The six piers that were previously installed, and their spacing, are illustrated on the Foundation <br /> Sketch, Plate 2. The pier spacings are less than 6.3 feet, except for the pier spacing between pier <br /> #4 and pier#5 which has a pier spacing of 7.3 feet. We recommend pier#4 be reinstalled so it is <br /> located at the midpoint between piers #3 and #5. This will create a pier spacing of 5.875 feet(±) <br /> between piers #3 and#4, and between piers #4 and#5. The unsupported foundation section <br /> between the pier brackets will be approximately 5.1 feet. <br /> The pier logs of the six piers previously installed were reviewed and encountered suitable bearing <br /> strata at a depth of 7 feet, measured from the top of the pier tube. Installation pressures between <br /> 1800 psi and 2,600 psi were recorded at the time of installation. Using the hydraulic conversion <br /> factor of 9.62 lbs/psi, the pier installation pressures have equivalent pier load capacities of <br /> between 17,316 lbs and 25,012 lbs and equivalent pier working load capacities of between 8,658 <br /> lbs and 12,506 lbs. The pier depths and equivalent load capacities of the six piers installed are <br /> acceptable, with the exception of pier#4 which we recommend reinstalling to satisfy the max. <br /> pier spacing and max. span requirements. <br /> GEO Group Northwest, Inc. <br />