My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5131 DOGWOOD DR 2016-08-31
>
Address Records
>
DOGWOOD DR
>
5131
>
5131 DOGWOOD DR 2016-08-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2016 1:33:47 PM
Creation date
8/3/2016 10:28:07 AM
Metadata
Fields
Template:
Address Document
Street Name
DOGWOOD DR
Street Number
5131
Notes
GEOTECHNICAL & UNDERPINNING REPORT INCLUDED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 12, 2015 G-3945 <br /> Geotechnical Evaluation&Underpinning Engineering Page 5 <br /> 5131 Dogwood Drive, Everett <br /> PIER INSTALLATION DESCRIPTION <br /> The push pier is advanced into the soil with a hydraulic pump and cylinder combination using the <br /> structure as the reaction force. The hydraulic pressure is monitored with a calibrated pressure <br /> gauge and the tube installation pressures recorded. When the tip of the pier reaches suitable <br /> bearing strata the hydraulic force on the pier is gradually increased to 200 percent of the design <br /> load or until movement of the design frame occurs (the foundation begins to lift). <br /> INSPECTION <br /> We recommend the final pier depths and the recorded pier installation pressures be reviewed by <br /> the geotechnical engineer to verify proper embedment to the bearing strata and to verify <br /> acceptable pier capacities are achieved. <br /> EVALUATION OF PIERS PREVIOUSLY INSTALLED <br /> The six piers that were previously installed, and their spacing, are illustrated on the Foundation <br /> Sketch, Plate 2. The pier spacings are less than 6.3 feet, except for the pier spacing between pier <br /> #4 and pier#5 which has a pier spacing of 7.3 feet. We recommend pier#4 be reinstalled so it is <br /> located at the midpoint between piers #3 and #5. This will create a pier spacing of 5.875 feet(±) <br /> between piers #3 and#4, and between piers #4 and#5. The unsupported foundation section <br /> between the pier brackets will be approximately 5.1 feet. <br /> The pier logs of the six piers previously installed were reviewed and encountered suitable bearing <br /> strata at a depth of 7 feet, measured from the top of the pier tube. Installation pressures between <br /> 1800 psi and 2,600 psi were recorded at the time of installation. Using the hydraulic conversion <br /> factor of 9.62 lbs/psi, the pier installation pressures have equivalent pier load capacities of <br /> between 17,316 lbs and 25,012 lbs and equivalent pier working load capacities of between 8,658 <br /> lbs and 12,506 lbs. The pier depths and equivalent load capacities of the six piers installed are <br /> acceptable, with the exception of pier#4 which we recommend reinstalling to satisfy the max. <br /> pier spacing and max. span requirements. <br /> GEO Group Northwest, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.