My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1617 EDGEMOOR LN 2016-11-10
>
Address Records
>
EDGEMOOR LN
>
1617
>
1617 EDGEMOOR LN 2016-11-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2022 10:08:13 AM
Creation date
8/3/2016 10:46:47 AM
Metadata
Fields
Template:
Address Document
Street Name
EDGEMOOR LN
Street Number
1617
Notes
GEOTECHNICAL REPORT INCLUDED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Retaining Wall Installation Final Letter NGA File No. 9106B 15 <br />Mckinnon Residence Retaining Wall June 15, 2016 <br />Everett, Washington Page 2 <br />Site Observations <br />We monitored wall installation activities on a part-time basis from August 3, 2015 through August 31, <br />2015. Our observations during wall installation at this project were documented in Field Reports 1 <br />through 9, which have been submitted to you. The new wall was located along the top of the steep slope <br />immediately below the existing yard area. <br />We observed the installation of 28, 3-inch square schedule 80 piles that were driven with a 140-pound air <br />hammer to a total embedment depth in the range of 7.0 feet to 12.0 feet below ground surface along the <br />wall alignment. All of the piles were driven to the recommended refusal rate of less than 1-inch of <br />movement in 60 seconds of driving. In our opinion, the pin piles were installed in accordance with our <br />recommendations and the approved plans, and should support the wall. <br />We observed the installation of eight helical anchor tieback anchors along the wall alignment. The helical <br />tiebacks consisted of double -flight, 10-, and 12-inch helix anchors with 1-1/2-inch solid square shafts. <br />The anchors were driven to depths in the range of 11.5 to 19.0 feet from the face of the retaining wall <br />back into the slope. The anchors were driven until the max torque of the drive head used to drive the <br />anchors was reached and the anchor shafts began to twist. This torque was measured at approximately <br />1,800 to 2,300 PSI at the drive head. The anchors were installed at an approximate angle of 15 degrees <br />below horizontal. After installation, we returned to conduct a load test on one of the helical anchors to <br />verify the load carrying capacity. We conducted the test on Anchor 4. The anchor was tested in 50% <br />increments of the design load to a maximum load of 200% of the design load of 10.0 kips. We observed <br />minimal movement of the anchor during the testing and the hold periods, and the tested anchor appeared <br />to perform well. In our opinion, all of the anchors were installed in accordance to the plans and our <br />recommendations. <br />We returned to the site on June 9, 2016 and observed that yard and drainage improvements had been <br />completed. We were provided with detailed pictures and descriptions of the installed drainage <br />improvements within the property. We understand that a series of french drains were installed within the <br />yard and driveway area along with drainage lines from the roof drains that lead to a main catch basin <br />located directly behind the retaining wall. After the installation of the pin piles and helical anchors, we <br />observed that a retaining wall foundation drain consisting of a 4-inch perforated PVC pipe was placed <br />behind the base of the retaining wall and covered with drain rock and filter fabric leading into the main <br />catch basin behind the retaining wall. A new 6-inch HDPE pipe connected to the main catch basin was <br />NELSON GEOTECHNICAL ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.