My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1617 EDGEMOOR LN 2016-11-10
>
Address Records
>
EDGEMOOR LN
>
1617
>
1617 EDGEMOOR LN 2016-11-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2022 10:08:13 AM
Creation date
8/3/2016 10:46:47 AM
Metadata
Fields
Template:
Address Document
Street Name
EDGEMOOR LN
Street Number
1617
Notes
GEOTECHNICAL REPORT INCLUDED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEERING <br />June 30, 2016 <br />Mr. Bruce McKinnon <br />1617 Edgemoor Lane <br />Everett, WA 98203 <br />civil & structural <br />engineering & planning <br />Re: McKinnon Retaining Wall Final Approval Letter <br />1617 Edgemoor Lane <br />.O CG Project No.15038.10 <br />Dear Mr. McKinnon, <br />In our final site visit to review the retaining wall construction that we made on June 9, 2016, we identified in <br />our Structural Observation Report #1, a>construction issue with Dispersal "r for the drainage system on the <br />slope. We observed that the Dispersal "I' was clogged with concrete cement paste from washing the exposed <br />aggregate concrete driveway into the drainage system. <br />Since that report was submitted to you we understand that you had Bodine Construction Services, the original <br />contractor on the project, return to your home to fix the clogged Dispersal "T". You have sent us detailed <br />descriptions and photos of the repair of the Dispersal'?" completed by Bodine Construction Services in an <br />email that you sent to us on June 26, 2016. We have included some of the photos of the repair work that you <br />documented during the repair process which is attached to this final letter. We find no reason to revisit the <br />site to verify that the repair has been completed successfully and in accordance with our recommendations <br />and those that Nelson Geotechnical stated in their final summary letter dated June 15, 2016. <br />Based upon our final inspection and our Observation Report dated June 9, 2016 and the information that you <br />have provided regarding the repair work completed, the retaining wall and the drainage system has been <br />installed per our recommendations and approved structural and civil drawings. <br />We trust this final letter meets your requirements at this time. <br />Sincerely, <br />CG Engineering <br />Gr illen, PE, SE <br />Principal <br />Attachment: Photos and Description of Repair (prepared by Bruce McKinnon) <br />250 4th Avenue South, Suite 200 <br />Edmonds, WA 98020 <br />ph.425.778.8500 1 f.425,778.5536 <br />www.cgengineering.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.