Laserfiche WebLink
ECN NO./ <br /> PAGE 2 OF 17 <br /> ARSENE PROFESSIONAL ENGINEERS INC. <br /> CALCULATION SHEET <br /> Project 18-TAEC-008 Site Location EVERETT <br /> Subject STRUCTURAL ANALYSIS OF TAEC SITE SE01688A Sheet of <br /> REV I ORIGINATOR I DATE I REVIEWER I DATE IL_JI REV I ORIGINATOR I DATE I REVIEWER I DATE <br /> 0 A.COCOSILA 05/31/2018 F.ARSENE 05/31/2018 <br /> 1 PROJECT SCOPE <br /> The scope of this structural design report is as follows: <br /> • REMOVE (2) EXISTING ULTRASITE CABINETS <br /> • REMOVE (3) EXISTING (SBNH-1 D65C)ANTENNAS (1 PER SECTOR) <br /> • REMOVE (3) EXISTING FRLB FROM ANTENNA AREA (1 PER SECTOR) <br /> • INSTALL (3) NEW (FFHH-65C-R3)ANTENNA(1 PER SECTOR) <br /> • INSTALL (3) NEW AHLOA IN ANTENNA AREA <br /> • INSTALL (2) NEW FCOA CABINETS <br /> • INSTALL (2) NEW AMOB IN CABINET <br /> • INSTALL (1) NEW ASIA IN CABINET <br /> • INSTALL (3) NEW ABIA IN CABINET <br /> • INSTALL (1) NEW ASIK IN CABINET <br /> • INSTALL (1) NEW ABIL IN CABINET <br /> I <br /> ARSENE PROFESSIONAL ENGINEERS INC(CALCULATION SHEET 06/2012) <br />