Laserfiche WebLink
INSPECTION REPORT <br /> Date WM//9 Permit:'''' k /'//z —°LOU <br /> Contractor: ' <br /> ii/eart <br /> Owner: F . <br /> Site Address: 011 E-VVr <br /> e.)-7 i A laj <br /> PE <br /> TYPE OF IN S O REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑R flop Units ❑Water Service <br /> ❑Grounding ❑Insulation tlechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final /�f I HWT�Final <br /> OTHER OR CONSULTATION: 20 V 59 <br /> L3©7 1 T"` r (Clfi. <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED /Jo_ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION–24 hour notice required <br /> F i')Lf fri--1--- ok, <br /> 6 6 0-Ee__-T- TO <br /> ______±/___V----- G .- 5 - .... <br /> Inspector: 1( Date: <br /> EIR(10/06) DATABAR,INC. <br />