My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA Dept of Ecology WQC-2016-EverPW-00014 6/8/2016
>
Contracts
>
6 Years Then Destroy
>
2018
>
WA Dept of Ecology WQC-2016-EverPW-00014 6/8/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2016 10:22:06 AM
Creation date
8/4/2016 10:21:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA Dept of Ecology WQC-2016-EverPW-00014
Approval Date
6/8/2016
Council Approval Date
6/1/2016
End Date
12/31/2018
Department
Public Works
Department Project Manager
Richard Tarry
Subject / Project Title
Cleveland Ave Sewer Repl Financial Assistance
Tracking Number
0000216
Total Compensation
$333,333.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State of Washington Department of Ecology Page 10 of 41 <br /> Agreement No: WQC-2016-EverPW-00014 <br /> Project Title: Cleveland Ave.Sewer Replacement and Stormwater Separation <br /> Recipient Name: City of Everett-Public Works Department <br /> Recipient Task Coordinator: Dave Voigt <br /> Design Plans and Specs,Environmental Review <br /> Deliverables <br /> Number Description Due Date <br /> 2.1 Copy of SEPA determination documentation. Upload to EAGL and <br /> notify ECOLOGY when upload is complete. <br /> 2.2 Complete DAHP EZ-1 Form or Ecology Historic and Cultural Resource <br /> Project Review Form; Submit supplemental cultural resources <br /> documentation if available.Upload to EAGL and notify ECOLOGY <br /> when upload is complete. Cultural Resource surveys should be <br /> submitted directly to the ECOLOGY Project Manager and should not be <br /> uploaded to the EAGL system. <br /> 2.3 Inadvertent Discovery Plan.Upload to EAGL and notify ECOLOGY <br /> when upload is complete. <br /> 2.4 Design Report.Upload to EAGL and notify ECOLOGY when upload is <br /> complete. Submit one hard copy of Design Report to ECOLOGY <br /> Engineer. <br /> 2.5 Responses to ECOLOGY Design Report Comments.Upload to EAGL <br /> and notify ECOLOGY when upload is complete. <br /> 2.6 Ecology Design Report Acceptance Letter.Upload to EAGL and notify <br /> ECOLOGY when upload is complete. <br /> 2.7 90 percent Design Plans,Bid Specifications,and Engineer's Estimate. <br /> Upload to EAGL and notify ECOLOGY when upload is complete. <br /> Submit one hard copy of 90 percent Design Plans,Bid Specifications, <br /> and Engineer's Estimate to ECOLOGY Engineer. <br /> 2.8 Responses to ECOLOGY 90 percent Design Plan Comments.Upload to <br /> EAGL and notify ECOLOGY when upload is complete. <br /> 2.9 Ecology 90 percent Design Acceptance Letter.Upload to EAGL and <br /> notify ECOLOGY when upload is complete. <br /> 2.10 List of permits acquired,and environmental review documents.Upload <br /> to EAGL and notify ECOLOGY when upload is complete. <br /> 2.11 Final Bid Package(Include Project Plans, Specifications,Engineer's <br /> Estimate and Project Construction Schedule.Upload to EAGL and notify <br /> ECOLOGY when upload is complete. <br /> Version 10/30/2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.