Laserfiche WebLink
,State of Washington Department of Ecology Page 13 of 41 <br /> Agreement No: WQC-2016-EverPW-00014 <br /> Project Title: Cleveland Ave.Sewer Replacement and Stormwater Separation <br /> Recipient Name: City of Everett-Public Works Department <br /> SCOPE OF WORK <br /> Task Number: 4 Task Cost: $1,288,000.00 <br /> Task Title: Construction <br /> Task Description: <br /> A. The RECIPIENT will,in accordance with ECOLOGY-reviewed plans and specifications,complete construction of <br /> the project. The construction project will include installation of a stormwater collection network and stormwater <br /> treatment units to mitigate runoff from a minimum of 27 acres of pollution generating impervious surfaces. <br /> B. Calculate and submit an equivalent new/re-development area for the completed retrofit project(s)using the methods <br /> outlined in Appendix N of the funding guidelines for State Fiscal Year 2016 Combined Water Quality Financial <br /> Assistance Program or other ECOLOGY-approved method. <br /> Task Goal Statement: <br /> Project will be constructed in accordance with ECOLOGY-accepted plans and specifications. <br /> Task Expected Outcome: <br /> Constructed project will provide water quality benefits including reductions in(LIST PARAMETERS FROM SHORT <br /> PROJECT DESCRIPTION) <br /> Recipient Task Coordinator: Dave Voigt <br /> Construction <br /> Deliverables <br /> Number Description Due Date <br /> 4.1 Copy of the contract documents(e.g.bid announcement,bid award and <br /> bid tabulations).Upload to EAGL and notify ECOLOGY when upload is <br /> complete. <br /> 4.2 Copy of signed and dated construction contract.Upload to EAGL and <br /> notify ECOLOGY when upload is complete. <br /> 4.3 Construction progress reports and photos included in quarterly reports. <br /> 4.4 Completed equivalent new/redevelopment area determination.Upload to <br /> EAGL and notify ECOLOGY when upload is complete. <br /> Version 10/30/2015 <br />