Laserfiche WebLink
7/2/2015 Page <br /> City of Everett <br /> 2:12:25PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. X1207-001 Site Address 7815 EVERGREEN WAY <br /> Applied 7/3/2012 Applicant Lot <br /> Approved 7/3/2012 Owner EVERGREEN BUILDING MGMT LLC Block <br /> Issued 7/3/2012 Contractor BILLS PLUMBING&GAS Tract <br /> Parent Permit No. B1206-028 Description PLUMBING&GAS PIPING-TI-KING NOODLE HOUSE <br /> Notes GAS PIPING FOR COOK LINE <br /> Scheduled Completed Tvpe Inspector Result Remarks Inspector's Comments <br /> 7/16/2012 7/16/2012 PlbgGrWork DXW Approval As per notes 2 grease traps and flow control must be <br /> accessible. RPBA required for ice machine. <br /> Only 1-2"floor sink to grease on East wall <br /> 13"floor sink for grease on south wall <br /> Drains must take all waste water without <br /> overflow <br /> 7/16/2012 7/16/2012 PlbgGrWork SDP Corr Reqd See notes 1. Re-plumb floor sinks into grease trap so <br /> that they each have proper venting <br /> Notes: <br /> 1. RPBA or physical air gap is required on <br /> ice makers <br /> 2. Maintain all ADA requirements in <br /> restrooms 16-18"from toilet center to side <br /> wall <br /> 3. All grab bars are required <br /> 7/24/2012 7/24/2012 PlbgRoughln DXW PartialApproval See notes Rough in waste vents only ok <br /> Except 2-2"ABS vents 1-1/2 PVC vent <br /> 3-1 112 ABS vents not thru roof at or <br /> before final <br /> Complete rough in water and call for <br /> inspection <br /> 7/25/2012 7/25/2012 PlbgRoughln DXW Approval As per notes Rough in water ok,rough in waste vents ok <br /> exceptthru roof <br /> Call for future inspection on vents <br /> Keep flow control accessible <br /> 9/14/2012 9/14/2012 PlbgRoughln SDP Approval As per notes As noted: <br /> 1.Gas line from cook line accross roof and <br /> down to meter tested at 20 PSI ok for <br /> service <br /> 2.Will look at gas pipe on roof at final <br /> inspection <br /> 10/22/2012 10/22/2012 Final Mech DXW Corr Reqd See notes (10/22/2012 1:57 PM CRB) <br /> Complete insulation shield for hot water <br /> tank and 1"min.clearance at roof for <br /> B-vent to combustables clamp. Gas piping <br /> to blocks on roof. <br /> 10/22/2012 10/22/2012 Final Plbg DXW Approval See notes (10/22/2012 1:45 PM CRB) <br /> 1. As noted subject to health department <br /> 2. Uncover floor drain in women's bath and <br /> complete wrap on p4traps and hot water. <br /> INSP12 <br />