My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7815 EVERGREEN WAY KING NOODLE HOUSE 2017-04-19
>
Address Records
>
EVERGREEN WAY
>
7815
>
KING NOODLE HOUSE
>
7815 EVERGREEN WAY KING NOODLE HOUSE 2017-04-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2017 3:23:50 PM
Creation date
8/4/2016 11:52:33 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7815
Tenant Name
KING NOODLE HOUSE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7/2/2015 Page <br /> City of Everett <br /> 2:12:25PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. X1207-001 Site Address 7815 EVERGREEN WAY <br /> Applied 7/3/2012 Applicant Lot <br /> Approved 7/3/2012 Owner EVERGREEN BUILDING MGMT LLC Block <br /> Issued 7/3/2012 Contractor BILLS PLUMBING&GAS Tract <br /> Parent Permit No. B1206-028 Description PLUMBING&GAS PIPING-TI-KING NOODLE HOUSE <br /> Notes GAS PIPING FOR COOK LINE <br /> Scheduled Completed Tvpe Inspector Result Remarks Inspector's Comments <br /> 7/16/2012 7/16/2012 PlbgGrWork DXW Approval As per notes 2 grease traps and flow control must be <br /> accessible. RPBA required for ice machine. <br /> Only 1-2"floor sink to grease on East wall <br /> 13"floor sink for grease on south wall <br /> Drains must take all waste water without <br /> overflow <br /> 7/16/2012 7/16/2012 PlbgGrWork SDP Corr Reqd See notes 1. Re-plumb floor sinks into grease trap so <br /> that they each have proper venting <br /> Notes: <br /> 1. RPBA or physical air gap is required on <br /> ice makers <br /> 2. Maintain all ADA requirements in <br /> restrooms 16-18"from toilet center to side <br /> wall <br /> 3. All grab bars are required <br /> 7/24/2012 7/24/2012 PlbgRoughln DXW PartialApproval See notes Rough in waste vents only ok <br /> Except 2-2"ABS vents 1-1/2 PVC vent <br /> 3-1 112 ABS vents not thru roof at or <br /> before final <br /> Complete rough in water and call for <br /> inspection <br /> 7/25/2012 7/25/2012 PlbgRoughln DXW Approval As per notes Rough in water ok,rough in waste vents ok <br /> exceptthru roof <br /> Call for future inspection on vents <br /> Keep flow control accessible <br /> 9/14/2012 9/14/2012 PlbgRoughln SDP Approval As per notes As noted: <br /> 1.Gas line from cook line accross roof and <br /> down to meter tested at 20 PSI ok for <br /> service <br /> 2.Will look at gas pipe on roof at final <br /> inspection <br /> 10/22/2012 10/22/2012 Final Mech DXW Corr Reqd See notes (10/22/2012 1:57 PM CRB) <br /> Complete insulation shield for hot water <br /> tank and 1"min.clearance at roof for <br /> B-vent to combustables clamp. Gas piping <br /> to blocks on roof. <br /> 10/22/2012 10/22/2012 Final Plbg DXW Approval See notes (10/22/2012 1:45 PM CRB) <br /> 1. As noted subject to health department <br /> 2. Uncover floor drain in women's bath and <br /> complete wrap on p4traps and hot water. <br /> INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.