Laserfiche WebLink
:, INSPECTION REPORT /2-C, (2--16A4.1 <br /> ii <br /> Date: g1 Permit: /1/1. I v7 -© ''I v <br /> Ah,. A4.1.44 . UCO 2,55 <br /> Contractor: <br /> Owner:_4 1 ,,j VV <br /> Site Address: SS3) SPE L' 't Walti <br /> TYPE OF INION REQUESTED <br /> ELECTRICAL BUILDING )(MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final LI Medical Gas <br /> Li Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains [I Ceiling Grid ❑Refrigeration ❑ Rough In <br /> 0 Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL 7cARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. i CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> P\ 19-C--( g.cine-,7\-e II -e141-d•-8, <br /> 4Q C PAcALeM 5 4'2 <br /> sIcc -f-f:•A , 7--- f— °(7 57— <br /> • <br /> P75— <br /> e -2 <br /> Inspector: Date: - 1 cLIR <br /> LIR(4/09) )[' ie (UKM,%&PR/MO IION..42 /488-nmro <br />