Laserfiche WebLink
„,, i1Jv INSPECTION REPORT <br /> Date: VJ 11/111, Permit: M I0---1 _ VUJ2 <br /> Ni <br /> Contractor: 6C,4 M-ed& if IVP <br /> Owner: Fre 0 M-Qiti Q/, <br /> Site Address: Ce-6o '`VQY ,QQA V v <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑ Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid []Refrigeration ❑ Rough In <br /> []Roof drains LI Building Final ❑Gas PipeFinal LI HWT Final <br /> OTHER OR CONSULTATION(2 DUI) U -- (-4-70 Ale$ <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> t.,OA A``"(' t(711,0”( 44) //<,,,, <br /> I <br /> ----/.._____ , <br /> Aid 7_____ 4,2 ....................s.,..,„ <br /> _, <br /> -N).-z--- ..7 ,.. <br /> Inspector: p <br /> i Date: I) i`[ / <br /> E IR(4/09) /-+h/A_TiT .I OI MS v,PROMOTIONS• 42',/488-8901/ <br />