My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2653-02
>
Ordinances
>
Ordinance 2653-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2014 4:07:48 PM
Creation date
4/24/2014 4:07:47 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2653-02
Date
10/9/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. 2653-02 <br /> AN ORDINANCE amending Ordinance No. 2469-00 entitled <br /> "Downtown Police Headquarters Remodel", Fund 342, Program 002, <br /> authorizing the design and construction of alterations to the Police <br /> Headquarters. <br /> WHEREAS, the City Council has recognized the need to remodel the Police <br /> Headquarters Building, located at 3002 Wetmore. <br /> WHEREAS, Ordinance No. 2469-00 was established to fund the construction of the <br /> Downtown Police Headquarters Remodel. <br /> WHEREAS, additional funding is necessary to complete the construction of the <br /> Downtown Police Headquarters Remodel. <br /> NOW, THEREFORE, THE CITY OF EVERETT DOES ORDAIN: <br /> Section 1: A special construction project is hereby established as Fund 342, Program <br /> 002, entitled "Downtown Police Headquarters Remodel" to accumulate the design and <br /> construction costs required to construct alterations to the Police Headquarters. <br /> Section 2: Authorization is hereby granted to the Facilities/Property Management <br /> Director under the administration of the Mayor, to assume full responsibility for <br /> conducting all tasks and performing all necessary steps to accomplish the actions <br /> authorized by this Ordinance. <br /> Section 3: Section 3 Of Ordinance 2469-00 which reads as follows: <br /> The estimated cost of the project is $400,000 including costs related to design, <br /> construction, equipment, and contract administration. <br /> Be and the same is hereby amended to read as follows: <br /> The estimated cost of the project is $673,000 including costs related to design, <br /> construction, equipment, and contract administration. <br />
The URL can be used to link to this page
Your browser does not support the video tag.