My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7510 E HEATHER WAY 2016-08-05
>
Address Records
>
E HEATHER WAY
>
7510
>
7510 E HEATHER WAY 2016-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2016 2:14:39 PM
Creation date
8/5/2016 2:14:34 PM
Metadata
Fields
Template:
Address Document
Street Name
E HEATHER WAY
Street Number
7510
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7/26/2015 City of Everett Page 1 <br /> 4:38:32PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B1308-054 Site Address 7510E HEATHER WAY <br /> Applied 8/30/2013 Applicant Lot <br /> Approved 9/23/2013 Owner GARDNER RACHAEL&JEFF Block <br /> Issued 10/1/2013 Contractor CUSTOM HOMES NORTHWEST Tract <br /> Parent Permit No. Description SFR ADDITION W/GARAGE <br /> Notes WITH LIVING SPACE ON TOP OF GARAGE GARAGE TO BE ATTACHED WITH A <br /> BREEZEWAY. <br /> *LIVING SPACE SQUARE FOOTAGE MUST BE COMPLETED AS SHOWN ON PLAN <br /> Scheduled ComDleted Tvne Inspector Result Remarks Inspector's Comments <br /> 10/15/2013 10/15/2013 Footing KMK Corr Reqd See notes On your main floor foundation plan I see <br /> two 1/2'8"return walls with HD54's. <br /> Where is your footing for these <br /> Phone conversation with Jeff 10-15-13 <br /> 12:30 p.m.: <br /> 1)OK to pour perimeter. <br /> 2)Interior footing to be continuous and <br /> epoxy rebar into perimeter wall <br /> 11/20/2013 11/20/2013 Foundation KMK Approval OK to pour <br /> 11/20/2013 11/20/2013 Footing KMK Approval <br /> 12/10/2013 12/10/2013 ShearNailing DWF Corr Reqd See notes Complete shear nail as per shear schedule <br /> 8D at 6"OC edges <br /> 8D at 12"OC field <br /> 12/10/2013 12/10/2013 Foundation DWF Corr Reqd <br /> 2/28/2014 2/28/2014 ShearNailing KMK Approval <br /> 2/28/2014 2/28/2014 Footing KMK Approval See notes Footing for breezeway posts,OK to pour <br /> 3/25/2014 3/25/2014 Framing KMK Corr Reqd See notes 1)Add anchor bolts at cut A)bottom <br /> plates-garage B)Beside man door back <br /> room <br /> 2)Solid blockingNorth side at eave(see <br /> plans) <br /> OK to insulate <br /> 4/1/2014 4/1/2014 InsulBldg DWF Corr Reqd See notes Framing corrections 1)Need to install <br /> 3"'x3"xl/4"washers galvanized <br /> 2)Provide a copy of letter certificate of <br /> insulation OK for ceiling(drywall)only at <br /> Final. <br /> 3)Correct exterior stairway-12'-0"max <br /> run for stairway required landing as per <br /> IRC. <br /> 4/3/2014 4/3/2014 InsulBldg DWF Approval Framing/Insulation/ Framing approved,OK to cover <br /> See notes Insulaton,Okto cover(drywall) <br /> INSP12 `1 W— f" <br />
The URL can be used to link to this page
Your browser does not support the video tag.