My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7510 E HEATHER WAY 2016-08-05
>
Address Records
>
E HEATHER WAY
>
7510
>
7510 E HEATHER WAY 2016-08-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2016 2:14:39 PM
Creation date
8/5/2016 2:14:34 PM
Metadata
Fields
Template:
Address Document
Street Name
E HEATHER WAY
Street Number
7510
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: 9/3/2013 <br /> �'► UBLIC WORKS PERMIT -001Public Works Permit#: PW1309 <br /> City of Everett Public Works Department Building Permit#; 61308-054 <br /> 3200 Cedar Street <br /> Everett, WA 98201 Planning Reference#: <br /> (425) 257-8810 <br /> j Public Works Fee $: $ 65.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> GARDNER RACHAEL & JEFF <br /> 7510 E HEATHER WAY <br /> EVERETT WA 98203 <br /> P <br /> PHONE: HONE: <br /> TAX PARCEL ID# 00594200400200 SITE ADDRESS: 7510E HEATHER WAY <br /> DESCRIPTION OF PROPOSED WORK: <br /> DRIVEWAY FOR GARAGE <br /> LIVING SPACE SQUARE FOOTAGE MUST BE COMPLETED AS SHOWN ON PLAN. <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br /> beginning the project. Call Cliff Lindman at 425-339-7404. w <br /> bales, <br /> 5. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br /> swales, or erosion blankets. ►--I <br /> 6. No dirt, mud, rocks or debris to be tracked onto roadway. <br /> 7. Pave driveway from the front property line out to the street paving. <br /> C <br /> h <br /> E"I <br /> 0 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages, costs, expenses, or causes of action that may arise <br /> because of installation and maintenance of the improvement <br /> or other right-of-way use hereto applied for and further agrees <br /> '� to remove same upon notice from the City and to replace <br /> Approved for Construction Date public property damaged thereby. <br /> FINAL INSPECTION Date <br /> Approved as Constructed Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. , <br />
The URL can be used to link to this page
Your browser does not support the video tag.