Laserfiche WebLink
i <br /> INSPECTION REPORT <br /> Date: l Permit: <br /> Contractor: <br /> �AM� Owner: <br /> Site Address <br /> TYPE OF INSPECTI REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑ Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Gr ❑Insulation ❑ Mechanical Final ❑Medical Gas <br /> Cg Gri ❑Drywall Nailing El Plumbing Final <br /> L <br /> ical F n ❑Shear Nailing GAS PIPE <br /> ORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> rains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final t ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR <br /> R REINSPECTION-24 hour notice required <br /> Inspector: Date: <br /> EIR(4/09) FORM X PROMOTIONS 425/488-8900 <br />