Laserfiche WebLink
INSPECTION REPORT <br /> Date: Per <br /> 6477 <br /> Contractor: <br /> Owner: <br /> Site Address: \s A- Nron d .�\V� <br /> TYPE OF INSPE&ION REQUESTED <br /> L BUILDING MECHANICAL PLUMBING <br /> rvice ❑LIFER ground ❑ Groundwork/Slab ❑ Groundwork/Slab <br /> roundwork Footing Rough In El Rough In <br /> r <br /> lE] E]ab/Conduit E]Foundation El Ceiling Grid El Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑ OK to insulate ❑ OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑ Mechanical Final El Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑ Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ? APPROVAL F1PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> C� <br /> Inspector: Date: J <br /> EIR(4/09) PROMOTION' 42,!a M IVAw <br />