Laserfiche WebLink
INSPECTION REPORT <br /> Date: Permit: <br /> Contractor. &Altb�'� 9 J <br /> I/ <br /> Owner: <br /> Site Address: PH <br /> �l I <br /> TYPE OF IN ECTION RE STED <br /> TRICAL BUILDING MECHANICAL PLUMBING <br /> �]Js <br /> Sery e [:]UFER ground ElGroundwork/Slab ❑Groundwork/Slab <br /> Pwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> V ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Drywall Nailing ❑Plumbing Final <br /> inal ❑Shear Nailing GAS PIPE <br /> ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> CONSULTATION: <br /> [ RPR AL ❑ PARTIALAPPROVAL FINAL APPROVAL THIS-PEiiAALL <br /> R T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Lcz <br /> /Vl q2r t <br /> Inspector: Date: <br /> EIR(4/09) aLSicnirrcw u: n rronurnoNs azs/anu-uvoo <br />