Laserfiche WebLink
l <br /> �- Residential Photovoltaic OTC Permit Application <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed <br /> in this Checklist.Allproject plans and supporting documentation must be provided on site for the inspector. <br /> --------To BE COMPLETED BY APPLICANT------- <br /> ® Project Information <br /> Property Owner Name: Nick Pembroke <br /> Project Address: 2406 Hillside Ln Parcel# <br /> City: Everett — - - State: wn - ZIP: 982U3 <br /> Day Phone: 42W6-5112 <br /> Contractor Name Forecast solar Luc <br /> Contractor license#: EC FORECRs883Dc <br /> .Contractor Day Phone: 425487-600n i <br /> PV system description <br /> (include manufacturer Modules Inverter <br /> and model#of PV Manufacturer:nek <br /> Manufacturer:Solectria <br /> modules and <br /> inverters): Model#ITEK HE 28OW Model#PV1760OTL <br /> 00e'Lerblai6ie if VOLIF LOMJeCt qva if eS for exped8'dC-c; [.`eoe iili'Cti jg: <br /> Yes JED] <br /> 1. PV system Is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detached accessory structure that <br /> is code compliant to setbacks and height,or code allows expansion of nonconformity for <br /> solar modules.[IRC 101.2] <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by ❑ <br /> the local jurisdiction. Rl <br /> 3. Rooftop is made from lightweight material such'as a single layer of composition shingles, ® 11metal roofing,lightweight masonry,or cedar shingles. <br /> 4. The installation shall comply with the manufacturer's instructions.[IRC M2302.2] 8 ❑ <br /> S. The Installation shall meet the requirements of NFPA 70 National Electric Code,and all <br /> required electrical permit(s)must be obtained from the Authority HavingJurisdiction to ® ❑ <br /> administer the electrical code.[IRC M2302.2] <br /> 6. The installation shall meet the requirements of the International Fire Code as amended ❑ <br /> by WA State.[IRC M2302.21 <br /> 7. The PV system is designed for the wind speed of the local area,and will be installed per ® _ ❑ <br /> the manufacturer's specifications.[IRC M2302.2.1(1)] . <br /> 8. The ground snow load does not exceed 70 pounds per square foot.[IRC M2302.2.1(2)] ❑ <br /> 9. Total dead load of modules,supports,mountings,raceways and all other appurtenances <br /> weigh no more than-four pounds per-square foot. [IRC M2302.2.1(3)] Hl <br /> Enter total dead load of system(ibsjftz): `� •5 <br /> 10. To address uplift,modules are mounted no higher than 18"above the surface of the <br /> roofing to which they are affixed.[IRC M2302.2.1(4)J <br /> 1 - <br />