Laserfiche WebLink
INSPECTION REPORT <br /> Date: Permit: CW 12-0 25 — 00 2- <br /> Contractor: <br /> Owner: FIA v_e_ <br /> Site Address: Z�tzU Royyo,yd <br /> TYPE OF INSPECT <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground wor lab workiSlab <br /> ❑Groundwork ❑Footing ❑Rough In ough In <br /> F-1 Slab/Conduit ❑Foundation ElCeiling Grid Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final El Gas <br /> Gas Pipe Final ElHWT Final <br /> OTHER OR CONSULTATION: `TZ5 Q-1 Z7 —0 S Z q <br /> ❑ APPROVAL ".PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> 7Y Ile M e- <br /> L <br /> c <br /> Inspector: ` Date: <br /> EIR(4/09) �/L�N/�Tu F FORMS&PROMOTIONS•425/488-8900 <br />