Laserfiche WebLink
INSPECTION REPORT <br /> LCL/ Date:/O& Permit: („ (2� Civ <br /> Contractor: i (, <br /> Owner: j-- '�4—EL <br /> Site Address: <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL MBING <br /> F]Temp Service [:]UFER ground El Groundwork/Slab Groundwork/Slab <br /> ❑Groundwork El Footing F1 Rough In ough In <br /> ❑Slab/Conduit El Foundation ❑Ceiling Grid Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑ Mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final / ❑HWT Final <br /> OTHER -CONSULTATION 423,—CJS <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> ? T ' <br /> IL <br /> C, <br /> Inspector: Date:b <br /> EIR(4/09) FORMS&PROMOTIONS 415/498-890U <br />