My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
812 HOYT AVE 2016-08-08
>
Address Records
>
HOYT AVE
>
812
>
812 HOYT AVE 2016-08-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 8:56:20 AM
Creation date
8/8/2016 8:56:17 AM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
812
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P1. Supports for solar modules are installed to spread the dead load across as many roof- <br /> framing members as needed to ensure that no point load exceeds fifty(50)pounds, ❑ <br /> [IRC M2302,2,1(5)] <br /> 127noncombustible <br /> photovoltaic modules and supporting structure shall be constructed of <br /> materials or fire-retardant treated wood equivalent to that required for ❑ <br /> roof construction. [IRC M2302.2,1] <br /> 13, Roof and wall penetrations shall be flashed and sealed to prevent entry of water, ❑ <br /> rodents,and insects. [IRC M2302.2.2] <br /> 14, PV modules are listed and labeled with a fire classification in accordance with UL 1703, ❑ <br /> [IRC M2302,2.31 <br /> Comments: <br /> If you answered yes to all of the above questions, the project qualifies for the over-the- <br /> counter permitting process. <br /> i Determine if your project qualifies for an Over-the-Counter electrical permit <br /> Yes No N/A <br /> 1. PV modules, inverters, and combiner boxes are Identified for use in PV systems. <br /> 2. The inverters are listed and labeled in accordance with UL 1741 and are listed for ❑ <br /> utility interaction. [IRC M2302.41 <br /> El <br /> 3, The AC interconnection point is on the load side of service disconnect. [NEC 690.64(B)] <br /> rA <br /> 4, The system meets all current NEC,City and Washington Cities Electrical Code ❑ <br /> requirements. <br /> 5, For Split-Buss modules the AC interconnection must be one of the six service ❑ ❑ <br /> disconnects. <br /> 6. Maximum load added to the panelboard is based on the rating of the panelboards bus/main OCPD <br /> combination in accordance with NEC 705.12(D)(2)(3)(b), and is limited to(check combination that <br /> applies): <br /> ❑225 amp bus/200 amp main OCPD-13,440 AC watts,maximum 70 amp inverter CCPD, <br /> ❑225 amp bus/225 amp main OCPD- 8,640 AC watts, maximum 45 amp inverter OCPD. <br /> 00 amp bus/200 amp main OCPD- 7,860 AC watts,maximum 40 amp inverter CCPD, <br /> ❑150 amp bus/150 amp main OCPD- 5,760 AC watts,maximum 30 amp inverter CCPD. <br /> ❑125 amp bus/125 amp main OCPD- 4,800 AC watts,maximum 25 amp Inverter OCPD. <br /> ❑125 amp bus/100 amp main OCPD- 9,600 AC watts, maximum 50 amp inverter CCPD. <br />
The URL can be used to link to this page
Your browser does not support the video tag.