Laserfiche WebLink
., �. INSPECTION REPORT <br /> Date: <br /> Contractor: <br /> wner: <br /> Site Addy S ae-)n <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation - A chanical Final ❑Medical Gas <br /> Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains [I Ceiling Grid F1 Refrigeration [] Rough In <br /> Roof drains Building Final ❑Gas Pipe Final ❑HWT Final <br /> (� 1 <br /> OTHER OR CONSULTATION: / _ '7,2— <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ O!:S,.9R C.O. ❑ VIOLATION <br /> UNABLE TO PERFORM INSPECTION: <br /> CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: Date: <br /> EIR(4/09) �'�•= T-gC-roams x raoMonoNs•42,/4+us-i{vuu <br />