Laserfiche WebLink
' 7 <br /> INSPECTION REPORT <br /> Date 1 b _ Permit: <br /> J <br /> Contractor: __ <br /> Owner: <br /> Site Address: 2'� L _l _ <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑ ructural Slab F-1OKto insulate E]OK to insulate <br /> F-1Service &Frramin .. ❑Rooftop Units ❑Water Service <br /> ❑Grounding sula' n ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid rywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains A -1ding <br /> ng Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> A-MIP'RO ❑ PARTIALAPPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ [-] F-1OK FOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ C 81 FOR REINSPECTION–24 hour notice required <br /> Inspector: J Date: <br /> El(10106) DATABAR,INC. <br />