My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022 HIGHLAND AVE 2016-08-11
>
Address Records
>
HIGHLAND AVE
>
2022
>
2022 HIGHLAND AVE 2016-08-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2017 8:11:19 PM
Creation date
8/11/2016 3:39:58 PM
Metadata
Fields
Template:
Address Document
Street Name
HIGHLAND AVE
Street Number
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />PROJECT MEMORANDUM <br />Daie: November 20, 2014 <br />To: Felix Huesca <br />2022 Highland Terrace <br />Everett, WA <br />From <br />Re <br />Mark Speidei, P.E. <br />I.L. Gross Structural Engineers <br />Huesca Addition Corrections (CW1410-002) <br />�� L.. GRo s s <br />STRUCTURAL ENGINEERS <br />��. �• ���� <br />�r���.4� ��;1l�ir_ �� <br />�-d u�a� �"� ";,; ;:� <br />��� ��crURaL����'�� <br />�' <br />"��`��'Inn�,�,�.�, <br />I am writing this letter in response to the structural items posed in the�C <br />Jeff Heilman on behalf of the City of Everett, dated November 12, 2014 <br />���[������� <br />NOV � 5 ?014 <br />'1' �� �VEC��i'T <br />�r���'vi��� <br />10. Provide Structural plans for the proposed deck off of the master bedroom, <br />including footings, post/footing connection, post/beam, guard rail construction <br />and height. <br />13 <br />14. <br />15 <br />The framing for the deck has been added to the structural plans on sheet S2. 0. <br />Additional details for the supports and their connections have been referenced <br />and added to sheets S3.0 and S4.1 as appropriate. <br />Provide sections/details for posts and pads in crawl space added without permits. <br />Show lateral and seismic connections. <br />New defails 2 and 13 have been added to S3.0 to show the recommended <br />seismic upgrade connections at the existing posts and footings. <br />Provide roof framing plan. Show how 3'-0" overhang at addition is supported. <br />Provicie Attic ventilation caleulation. <br />Refer to sheet S2.1 for the roof framing plan, and fhe original structural <br />calculations for member designs. The 36" eave is to be framed per detail 2/S4.1 <br />as referenced on the roof plan. Refer to the architectural plans for the venting <br />information. <br />Provide details knee brace construction and attachment. <br />The knee brace connection detail has been added to sheet A 103. The knee <br />braces are not required structurally. <br />23914 56"' Ave West Suite 200 Mountlake Terrace, WA (206)623-0769 or (425) 640-7333 <br />
The URL can be used to link to this page
Your browser does not support the video tag.