Laserfiche WebLink
Work Activity Work Order Page 3 <br />7/15/2015 9:12 <br />Issued By WDL WEAVER, DEAN L. <br />Issued Department Pw PUBLIC WORKS <br />Date Issued 5/26/2015 <br />Fund 401 Account 5 Program 710 Function 119 Activity 664 <br />Program <br />Title SO.75 INCH 9912 HOLLY DR. 710119664 <br />Work Order No 20151181 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br />Status 5/26/2015 Time 09:01 Original WO Billing <br />Vehicle Costs <br />Type Vehicle No Description Hours Cost Billing Date Billing Code Warehouse <br />V <br />J0046 <br />1999 STERLING 5 YARD DUMP 6 <br />103.2 <br />05/26/2015 <br />V <br />J0091 <br />2008 FORD 1.5 TON SERVICE TRUC 6 <br />61.8 <br />05/26/2015 <br />V <br />J0113 <br />2012 FORD 4X2 3 YARD DUMP TRUC 6 <br />116.4 <br />05/26/2015 <br />V <br />H0050 <br />2013 VACTOR/INTERNATIONAL 6 <br />377.4 <br />05/26/2015 <br />V <br />J0054 <br />00 FREIGHTLINER FL70 5 YD DUMP 2 <br />34.2 <br />06/01/2015 <br />V <br />J0056 <br />01 FORD 1 1/2 TON SERVICE TRUC 2 <br />19.8 <br />06/01/2015 <br />V <br />0214 <br />2008 FORD F250 4X4 3/4 TON .5 <br />3.75 <br />06/02/2015 <br />V <br />J0123 <br />2015 FORD F550 XL - 1.5 TON .5 <br />4.9 <br />06/02/2015 <br />V <br />0214 <br />2008 FORD F250 4X4 3/4 TON 2 <br />15 <br />06/09/2015 <br />V <br />J0123 <br />2015 FORD F550 XL - 1.5 TON 2 <br />19.6 <br />06/09/2015 <br />V <br />0214 <br />2008 FORD F250 4X4 3/4 TON 1 <br />7.5 <br />06/10/2015 <br />V <br />J0123 <br />2015 FORD F550 XL - 1.5 TON 1 <br />9.8 <br />06/10/2015 <br />V <br />J0124 <br />2015 FORD F550 XL 4X2 1.5 YD D 1 <br />16.71 <br />06/10/2015 <br />Total Vehicle Cost <br />$790.06 <br />Material Costs <br />Billing <br />Type <br />Mater No <br />Description <br />Quantity Cost <br />Date War <br />M <br />ADAP34000547 <br />ADAPTER 3/4 MIP X 3/4 IPS INSTA-TITE <br />1 <br />15.549 <br />05/26/2015 PAP <br />M <br />BOX000154347 <br />BOX METER MOLDED PLASTIC W/DI LID 11" X 18" <br />(SMALL) <br />1 <br />71.276 <br />05/26/2015 PAP <br />M <br />CORP34001847 <br />CORP STOP 3/4 CCT X 3/4 COPPER FLARE X 3/4 IPS INSTA-TITE <br />1 <br />38.381 <br />05/26/2015 PAP <br />M <br />ELL034101447 <br />ELBOW 3/4 NPT 90 DEG BRASS (1/4 BEND) <br />1 <br />4.081 <br />05/26/2015 PAP <br />M <br />METE34141847 <br />METER 5/8 X 3/4 NEPTUNE W/E-CODER R9001 CU FT STUB ANTENNA <br />1 <br />188.075 <br />05/26/2015 PAP <br />M <br />PIPE34060647 <br />PIPE 3/4 POLY IPS 200 PSI SIDR7 ASTM D2239 <br />12 <br />3.78 <br />05/26/2015 PAP <br />M <br />SADD44016847 <br />SERVICE SADDLE 6 W/3/4 CC TAP FOR 6 DI 6.63-7.60 <br />1 <br />19.679 <br />05/26/2015 PAP <br />M <br />SETT34033647 <br />SETTER COPPER 5/8 X 3/4 HEIGHT 12" LEG LENGTH 15" VI/HO <br />1` <br />159.362 <br />05/26/2015 PAP <br />Total Material <br />Cost 'f <br />$500.19 <br />NA Costs <br />Type <br />Na No <br />Description <br />-Guantttr <br />Cost <br />Billing Date War <br />NA <br />N/A <br />3/4 MINUS <br />2 <br />46.16 <br />05/26/2015 <br />NA <br />N/A <br />TR WIRE <br />15 <br />3.3 <br />05/26/2015 <br />NA <br />N/A <br />ASPHALT (CEMEX) <br />1 <br />66.73 <br />07/03/2015 <br />NA <br />N/A <br />CONCRETE (CEMEX) <br />1 <br />69.1 <br />07/03/2015 <br />Total NA Cost <br />$185.29 <br />Personnel Costs <br />