Laserfiche WebLink
Aspect GEOTECHNICAL ENGINEERING <br /> THREE LAKES BYPASS - CITY OF EVERETT <br /> A firm focused on earth +water science and engineering, ASPECT ADVANTAGES <br /> Aspect Consulting, LLC (Aspect) provides geotechnical, <br /> geologic, and hydrogeologic expertise from five We Understand the City of Everett <br /> Washington state locations(Bainbridge Island, Bellingham, In Everett,we understand what is underground.Aspect's <br /> Seattle, Wenatchee,and Yakima).Aspect's geotechnical Lead Geotechnical Engineer Erik Andersen has provided <br /> engineers understand the distinct needs of special purpose geotechnical engineering services for a wide range of <br /> districts and public utility agencies through decades of Everett projects, including the Riverfront <br /> experience providing support of water, sewer, and Re-Development,the new 41st Street Overcrossing, <br /> wastewater utility projects, including reservoirs, pump/lift Broadway Bridge Replacement, East Marine View Drive <br /> stations,vaults, and conveyance piping. Upgrades, Sewer H Replacement, Main P Replacement, <br /> and Sewer Separation PSO4. With Erik's track record of <br /> KEY STAFF high-quality professional geotechnical engineering <br /> service to the City of Everett,Aspect will help minimize <br /> ERIK 0. ANDERSEN, PE - SENIOR ASSOCIATE GEOTECHNICAL ENGINEER risk and maximize value for the Water Main R Project. <br /> Geotechnical support of utility projects has been the Proven Geotechnical Advisers <br /> cornerstone of Erik Andersen's 19-year professional Our staff's experience working directly for utility districts <br /> career. With specialized experience including 16 and with civil teams can be directly applied on strategic <br /> water/sewer lift station replacements, 12 wastewater and cost-effective field explorations, defining subsurface <br /> treatment plant upgrades, 10 water reservoir projects, risk early,and reducing construction risks and <br /> and 10 sewer projects involving trenchless pipeline, Erik unexpected project costs. <br /> has proven strategies to address geotechnical challenges. <br /> Efficient Adaptation to Changing Field Conditions <br /> HENRY HASELTON, PE PMP - PRINCIPAL GEOTECHNICAL ENGINEER Cross-trained to support environmental, hydrogeologic, <br /> With a 22-year geotechnical engineering career in both and geotechnical explorations, our field staff have the <br /> the private and public sector, Henry combines the design ability to recognize, problem solve, and adapt to <br /> innovation of a consultant with the risk tolerance unexpected conditions such as encountering <br /> mindset of a public agency to provide project contaminated materials or the need for construction <br /> approaches fitting within a range of budgets and dewatering. <br /> schedules. Nine years as the lead geotechnical engineer REPRESENTATIVE PROJECT <br /> for Seattle Public Utilities provided Henry a strong <br /> experience base from which he develops design EVERETT WATER MAIN P PROJECT <br /> recommendations and provides options-based advice. Aspect Consulting LLC recently completed a <br /> ASPECT SERVICES geotechnical engineering investigation supporting the <br /> City of Everett's Water Main Replacement P project. <br /> > Trenchless methods—horizontal drilling, microtunnel, The project included 900 lineal feet of new 8-inch <br /> bore and jack ductile iron water main along Forest Drive, and 1,200 <br /> > Trenched pipeline and pump station design lineal feet of 12-inch replacement ductile iron water <br /> main along Pacific Avenue. Aspect explored and <br /> > Seismic assessments evaluated subgrade conditions with a series of <br /> > Infiltration feasibility evaluation machine-drilled borings along both alignments. <br /> > Contaminated materials assessment Significant traffic volumes along Pacific Avenue <br /> > Site and subsurface characterization required a carefully coordinated and implemented <br /> > Shoring excavation and construction dewatering traffic control plan (TCP)and lane closure to allow safe <br /> > Geotechnical baseline reports for construction execution of the field work. Aspect conducted <br /> > Construction monitoring geotechnical engineering analyses related to open <br /> > Reservoirs and underground storage trench construction, pipe bedding and subgrade <br /> support, potential reuse of on-site materials as trench <br /> "Your traffic control plan is extremely well put backfill,construction dewatering,and pavement <br /> together. I appreciate the careful attention to restoration. Aspect's final geotechnical engineering <br /> detail. Thanks again for preparing such report was submitted on time and within budget. <br /> high-quality plans." <br /> -Michael Brick,City Traffic Control Engineer <br /> City of Everett <br />