Laserfiche WebLink
Work Element 2-UTILITY COORDINATION <br /> The Consultant shall coordinate with franchise utilities along the corridor in an effort to identify and possibly avoid <br /> utility conflicts. <br /> The following franchise utilities have facilities within the project limits as previously identified: <br /> • Frontier—Telephone <br /> • Snohomish County PUD—Power <br /> • Puget Sound Energy—Gas <br /> • Comcast—Cable(not currently shown on topographic base map,however will contact as a <br /> confirmation) <br /> This work element shall include the following tasks: <br /> 2.1 Utility Coordination and Contacts: • <br /> • Review utility coordination and conflict information from Phase 1 work and update the utility <br /> contacts list. <br /> • Prepare and provide franchise utilities with an introductory letter to the project,preliminary plan set <br /> which includes the existing utilities as shown in the existing topographic base map and the proposed <br /> roadway footprint for franchise utility review. It is expected that the franchise utilities will review and <br /> confirm the location of existing utilities and provide additional utility location information if <br /> necessary. <br /> • Provide franchise utilities with a copy of the 100%and final plan sets for informational purposes. <br /> 2.2 Conflicts Resolution: Identify potential utility conflicts and coordinate with franchise utilities as necessary <br /> to resolve conflicts. <br /> 2.3 Meetings: Coordinate and attend up to two meetings with franchise utilities as necessary and prepare <br /> meeting notes. <br /> Assumptions: <br /> • Franchise utilities will not need to be relocated as a result of this project. If it is determined that <br /> franchise utilities will need to be relocated as a result of the project improvements,or if the franchise <br /> utilities will do work(i.e.upgrades or modifications),coordination by the Consultant may be provided <br /> as an optional service. <br /> • This assumes potholing will not be required. Potholing services not included in this Scope of Services. <br /> Deliverables: <br /> • Letter and preliminary plan set to franchise utilities. <br /> • Copies of 100%,and final plans to franchise utilities. <br /> • Meeting notes. <br /> Work Element 3—FINAL ROADWAY DESIGN&PS&E Preparation <br /> The final design phase will taking the previously prepared 90%plans to final ad documents for plans,specifications, <br /> and opinion of cost(PS&E),and pavement design review. Since the project is being separated into phases,the <br /> previously prepared 90%plans will be parsed out.Under this Scope of Services,the roadway block of Hoyt Avenue <br /> will be prepared as a stand-alone set of bid documents. <br /> Everett Downtown Streetscape Improvements—Phase 2 Page 2 Scope of Services 6/23/2016 <br />