Laserfiche WebLink
PUB��c woRKs <br />PERMIT <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425) 257-8810 <br />OWNER NAME BOEING COI"iPANY <br />AND ADDRESS: <br />PO BOK 3707 MS �H-13 <br />SEATTLE BA <br />PHONE: <br />TAX PARCEL I.D. # 28�411Q1���01�0 <br />DESCRIPTION OF INS'iAI�L 4 TEST TiTTELI,S <br />PROPOSED WORK: <br />PERMIT CONDITIONS <br />98124 <br />Date ?/6/2004 <br />Public Works Permit # pA0407-005 <br />Building Permit # <br />Planning Reference # <br />Public Works Fee $ $D . QQ <br />Guarantee $ <br />APPLICANT NAME <br />AND ADDRESS: �ELDCA,MP DIRR <br />PHo"E: 4253425343 <br />PROJECTADDRESS:�pOO SEAAAY BLVD <br />1. All calls for inspection shall be made 24 hours in advance - phone (425) 257-8810 <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800-424-5555 <br />4. Restore any disturbed acea9 to their original condition. <br />5. Install wells sa as not to obstruct access road. Minimum of IOft off of roadway. <br />6. Protect the curb on seasaay blvd where entecing site. Replace any curb damaged by <br />this operation as directed. <br />7. Provide any erosion control a� needed. <br />for Construction <br />FINAL INSPECTION <br />Approved as Constructed <br />Date <br />ACKNOWLEDGEMENT OF CONDITIONS <br />/ A The undersigned owner/applicant hereby agrees to hold and <br />Q�f" save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement or <br />other right-of-way use hereto applied for and further agrees to <br />remove same upon notice from the City and to replace public <br />property damaged thereby. <br />Signature of Applicant <br />Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED <br />TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />