My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3000 SEAWAY BLVD 2019-11-04
>
Address Records
>
SEAWAY BLVD
>
3000
>
3000 SEAWAY BLVD 2019-11-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 11:59:08 AM
Creation date
8/12/2016 1:03:33 PM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
3000
Notes
RECORDS STORAGE ONLY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kirk Brooks <br />From: <br />Sent: <br />To: <br />Cc: <br />Subject: <br />� <br />Sewer at Test <br />Wells.doc <br />Dirk, <br />Kirk Brooks <br />Wednesday, November 24, 2004 4:23 PM <br />'Fieldcamp, Dirk H' <br />Paul Crane; Mark Sadler; Dennis Gabelman <br />RE: Test wells <br />� ��� d � `��5 <br />CO�� y ��e� <br />�0 D�-�nr� ll/Z¢�0� <br />We will add these two new wells to your existing permit as we discussed. The location as <br />shown on your drawing and noted on this email are acceptable. However, we do have our 24" <br />concrete sewer main that runs in the vicinity of where the new wells will be installed. I <br />have attached a drawing that shows approximately where the sewer is located. Be sure that <br />the underground location service gets called so it can be marked out before they begin. <br />The wells should be at least 10 feet away from the sewer main. Additional, Please use BMPs <br />when working next to the stream to avoid getting any dirt or silt into the stream. A silt <br />fence or straw-bale dam will likely prove adequate. Please let me know if there is <br />anything else I can help with. <br />Kirk <br />-----Original Message----- <br />From: Fieldcamp, Dirk H [mailto:dirk.h.fieldcamp@boeing.com] <br />Sent: Wednesday, November 24, 2004 10:17 AM <br />To: kbrooks@ci.everett.wa.us <br />Subject: Test wells <br />Kirk, <br />The two test wells we intend to install are about 20 feet away from the <br />stream and they will be installed sometime the week of Dec. 13. <br />Hopefully, that works for you. Let me know if you have any issues or <br />concerns with this. Thanks for your flexibiblity and support. Have a <br />great Thanksgiving. <br />Dirk H. Fieldcamp Jr. <br />Dirk H. Fieldcamp Jr. <br />Civic Affairs Manager <br />The Boeing Company <br />Everett District Facilities Services <br />(425)342-5343 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.