Laserfiche WebLink
• Page 2 Augu<_I8, 2014 <br /> Consiruction: <br /> `�1. Door and Hnndow,chedules have been added lo Ihe plan. An elevalion vievu o�the nevr docrs <br /> and windows, with sill and headcr heights shown, has been added. A keynote delailing door <br /> requiremenls has been added and references to that note placed at each door. <br /> J 2. New wall section details have been added to the plan. <br /> J 3. Relights have been identitied by schedule.There are to be no additional luminaires installed. If <br /> and where necess�ry,a lixlure may be moved irom one panel to anolher in the new oHices. <br /> Accessibility: <br /> / 1. An elevalion ol the new la�atory has been added showing;he requlred clevation of 34'. <br /> Delerred Items: <br /> 1. A separate mechanical permit will be submitted at a later time. <br /> 2. A roof pian will be submitled,if needed,al a later time. <br /> 3. A hood,il required,will�e identitied al a laler time. <br /> Sincerely, <br /> i <br /> j�'�' IG,1zcUi! <br /> Dale Pa�nell <br /> Designer <br /> aa� <br /> � <br />