Laserfiche WebLink
INSPECTION REPORT <br /> Date t -7i1 Permit: C% (7O7—air <br /> 4, <br /> Contractor: (,02-4 <br /> Owner: _7(6_0 C<c UA <br /> Site Address: l ?�/I 1 . .,__; <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑ eiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> leectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK El Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ ARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> - DA ,/ <br /> / <br /> tjG,r✓LG 1 Q 0 it -4-ert, CL <br /> Inspector: ;tez, <br /> j Date: /4/2 ,e/z_e l <br /> EIR(10!06) DATABAR,INC. <br />