Laserfiche WebLink
INSPECTION REPORT <br /> Date hermit: 1� " <br /> Is 671 <br /> Contractor: V V 1 ( �L r ( ji <br /> Q" Owner: <br /> Site Address: <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> wor ❑Footing ❑Rough In ❑Rough In <br /> In <br /> nduit ❑Foundation Ceiling Grid E]Ceiling Grid <br /> B Rough In F-1 Structural Slab ❑OK to insulate E]OK to insulate <br /> e ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> QF <br /> CONSULTATION: <br /> R�ORO L ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OR T.C.O. ❑ CORRECTION REQUESTED <br /> E] OKFOR C.O. VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required r <br /> Inspec Date: <br /> EIR(10/06) DATABAR,INC. <br />