Laserfiche WebLink
2012 Washington State En*Code Compliance Forms for Commercial, Groue, and >3 story R2 and R3 <br /> Mechanical Summary MECH-SUM <br /> 2012 Washington State Energy Code Compliance Forms for Commercial,Group R1,and>3 story R2 and R3 Revised June 2013 <br /> Project Info Project Address Port of Everett Leasing Offices Date 12/15/2014 <br /> 1205 Craftsman way For Building Dept. Use <br /> Everett, WA <br /> Applicant Name: RICE Group, Inc. (q(z 3o <br /> Applicant Address: 20201 Cedar Valley Rd, #120, Lynnwood, WA 98036 <br /> Applicant Phone: (425) 774-3829 <br /> Project Description Renovation of existing building, adding three leasing offices and one conference <br /> Briefly describe mechanical room.Spaces to be served by existing packaged rooftop heat pump unit(HP-3) <br /> system type and features. and new zone dampers with supplemental electric heat. <br /> E Includes Plans Drawings must contain notes requiring compliance with commissioning provisions per Section C408 <br /> Compliance Option Simple System O Complex System O Systems Analysis <br /> Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on <br /> the plans. For projects without plans,fill in the required information below. <br /> Cooling Equipment Schedule <br /> Equip. Equip Capacity2 OSA CFM SEER Econmizer Heat <br /> ID Type Brand Name' Model No.' Btu/h or Econo? or EER IPLV3 Option or Recovery <br /> Exception Y/N <br /> HP-3 Heat Existing Trane <br /> WHD150E30A <br /> (Exist) Pump packaged unit <br /> Heating Equipment Schedule <br /> Equip. Equip Capacity2 OSA cfm Heat <br /> ID Type Brand Name' Model NO.' Btu/h or Econo? Input Btuh Output Btuh Efficiency° Recovery <br /> Y/N <br /> HP-3 Heat Existing Trane <br /> WHD150E30A <br /> (Exist) Pump packaged unit <br /> See Zone Damper <br /> Schedule on drawing <br /> M2 for supplemental <br /> electric heat. <br /> Fan E ui ment Schedule <br /> Equip. Equip <br /> ID Type Brand Name' Model No.' CFM SP' HP/BHP Flow Controls Location of Service <br /> Service Water Heating Equipment Schedule <br /> Equip. Equip Input Sub- <br /> ID Type Brand Name' Model No.' Capacity Category EF' Location of Service <br /> 'If available. 2 As tested according to Table C403.2.3(1)A thru C403.2.3(8). 3 If required. 'COP,HSPF,Combustion Efficiency,or AFUE,as <br /> applicable. 5 Flow control types:variable air volume(VAV),constant volume(CV),or variable speed(VS). 6 Economizer exception number per <br /> /Y) <br />