Laserfiche WebLink
INSPECTION REPORT <br /> Date: I Permit: <br /> � f <br /> Contractor:_ <br /> Owner: <br /> t!�� U <br /> Site Address: -o <br /> TYPE OF INSPECTION REQUESTED <br /> BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/Slab ❑ Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑ Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑ OK to insulate ❑OK to insulate <br /> ❑S vice E]Framing [IRooftop Units ElWater Service <br /> rounding F1 Insulation El Mechanical Final El Medical Gas <br /> Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL �[LLk�-�?-�REIC <br /> APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. TION REQUESTED❑ OK FOR C.O. N <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL <br /> (42.5))2/577--8881 FOR REINSPECTION-24 hour notice required <br /> 19 <br /> Inspector:�� Date: `f <br /> EIR(4/09) �� S�.�FORMS K PROMOTIONS•425/488-8900 <br />